IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,597

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1703 # 09 Y:2017 09 2017 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,471 $1,968 Not Implemented
UK1703 # 10 Y:2017 10 2017 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $131 $0 Not Implemented
UK1703 # 11 Y:2017 11 2017 USE MINIMUM STEAM OPERATING PRESSURE $920 $0 Not Implemented
UK1703 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $720 $296 Not Implemented
UK1703 # 13 Y:2017 13 2017 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $451 $1,150 Not Implemented
MI0318 # 01 Y:2017 01 2017 TURN OFF EQUIPMENT WHEN NOT IN USE $60,626 $3,600 Implemented
MI0318 # 02 Y:2017 02 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $32,550 $39,636 Implemented
MI0318 # 03 Y:2017 03 2017 INSULATE BARE EQUIPMENT $21,088 $106,884 Not Implemented
MI0318 # 04 Y:2017 04 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,714 $1,660 Implemented
MI0318 # 05 Y:2017 05 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,034 $9,660 Implemented
MI0318 # 06 Y:2017 06 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,318 $3,540 Implemented
MI0318 # 07 Y:2017 07 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,294 $100 Implemented
MI0318 # 08 Y:2017 08 2017 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $3,591 $4,940 Implemented
MI0318 # 09 Y:2017 09 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,527 $3,864 Not Implemented
MI0318 # 10 Y:2017 10 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,481 $1,469 Implemented
MI0317 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,418 $1,660 Implemented
MI0317 # 02 Y:2017 02 2017 OPTIMIZE PLANT POWER FACTOR $33,420 $46,515 Implemented
MI0317 # 03 Y:2017 03 2017 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $29,203 $11,300 Not Implemented
MI0317 # 04 Y:2017 04 2017 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $18,556 $8,294 Implemented
MI0317 # 05 Y:2017 05 2017 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $16,568 $120 Implemented
MI0317 # 06 Y:2017 06 2017 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,683 $1,885 Implemented
MI0317 # 07 Y:2017 07 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,154 $2,140 Not Implemented
MI0317 # 08 Y:2017 08 2017 INSULATE BARE EQUIPMENT $431 $151 Not Implemented
MA0782 # 01 Y:2017 01 2017 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $18,221 $78,750 Not Implemented
MA0782 # 02 Y:2017 02 2017 INSULATE BARE EQUIPMENT $7,638 $1,583 Implemented