Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,737
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IP0137 # 03 Y:2020 | 03 | 2020 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $64,260 | $1,554 | Not Implemented |
IP0137 # 04 Y:2020 | 04 | 2020 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,117 | $2,100 | Implemented |
IP0137 # 05 Y:2020 | 05 | 2020 | USE PHOTOCELL CONTROLS | $184 | $138 | Not Implemented |
IP0137 # 06 Y:2020 | 06 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $789 | $1,348 | Implemented |
IP0137 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,777 | $4,138 | Implemented |
IP0137 # 08 Y:2020 | 08 | 2020 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,497 | $39,760 | Not Implemented |
WM0159 # 01 Y:2020 | 01 | 2020 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $54,997 | $46,180 | Not Implemented |
WM0159 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $50,357 | $43,670 | Implemented |
WM0159 # 03 Y:2020 | 03 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $30,640 | $45,000 | Not Implemented |
WM0159 # 04 Y:2020 | 04 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $7,843 | $3,560 | Not Implemented |
WM0159 # 05 Y:2020 | 05 | 2020 | INSTALL OCCUPANCY SENSORS | $4,345 | $4,350 | Not Implemented |
WM0159 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,043 | $11,523 | Not Implemented |
WM0159 # 07 Y:2020 | 07 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $841 | $0 | Not Implemented |
WM0159 # 08 Y:2020 | 08 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $780 | $1,585 | Not Implemented |
WM0159 # 09 Y:2020 | 09 | 2020 | UPGRADE CONTROLS ON COMPRESSORS | $589 | $1,748 | Implemented |
SF0556 # 01 Y:2020 | 01 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,802 | $0 | Implemented |
SF0556 # 02 Y:2020 | 02 | 2020 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,683 | $575 | Implemented |
SF0556 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $959 | $60 | Implemented |
SF0556 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,769 | $2,289 | Implemented |
SF0556 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,729 | $864 | Implemented |
SF0556 # 06 Y:2020 | 06 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,238 | $5,536 | Implemented |
SF0556 # 07 Y:2020 | 07 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,455 | $3,366 | Implemented |
SF0556 # 08 Y:2020 | 08 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,676 | $16,092 | Implemented |
SF0556 # 09 Y:2020 | 09 | 2020 | USE SOLAR HEAT TO MAKE ELECTRICTY | $57,865 | $348,493 | Implemented |
SF0556 # 10 Y:2020 | 10 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,250 | $1,064 | Not Implemented |