Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
7,713
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UF0525 # 09 Y:2019 | 09 | 2019 | REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL | $34,636 | $10,000 | Not Implemented |
MI0349 # 01 Y:2019 | 01 | 2019 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $30,080 | $110,000 | Not Implemented |
MI0349 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT WHEN NOT IN USE | $11,314 | $3,100 | Implemented |
MI0349 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,623 | $13,592 | Implemented |
MI0349 # 04 Y:2019 | 04 | 2019 | REDUCE HEAT GAIN BY WINDOW TINTING | $9,207 | $13,256 | Not Implemented |
MI0349 # 05 Y:2019 | 05 | 2019 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $7,565 | $9,500 | Implemented |
MI0349 # 06 Y:2019 | 06 | 2019 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,966 | $2,644 | Implemented |
MI0349 # 07 Y:2019 | 07 | 2019 | INSTALL OCCUPANCY SENSORS | $3,414 | $972 | Implemented |
MI0349 # 08 Y:2019 | 08 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,282 | $200 | Not Implemented |
MI0349 # 09 Y:2019 | 09 | 2019 | USE PHOTOCELL CONTROLS | $1,282 | $622 | Implemented |
MI0348 # 01 Y:2019 | 01 | 2019 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,411 | $167,280 | Implemented |
MI0348 # 02 Y:2019 | 02 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,401 | $2,020 | Implemented |
MI0348 # 03 Y:2019 | 03 | 2019 | UPGRADE OBSOLETE EQUIPMENT | $12,811 | $30,000 | Implemented |
MI0348 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,851 | $3,229 | Implemented |
MI0348 # 05 Y:2019 | 05 | 2019 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,415 | $18,468 | Not Implemented |
MI0348 # 06 Y:2019 | 06 | 2019 | USE SOLAR HEAT TO HEAT WATER | $4,487 | $12,390 | Not Implemented |
MI0348 # 07 Y:2019 | 07 | 2019 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $4,470 | $10,760 | Not Implemented |
MI0348 # 08 Y:2019 | 08 | 2019 | INSTALL OCCUPANCY SENSORS | $3,201 | $750 | Implemented |
MI0348 # 09 Y:2019 | 09 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,936 | $7,601 | Implemented |
MI0348 # 10 Y:2019 | 10 | 2019 | INSULATE BARE EQUIPMENT | $288 | $507 | Implemented |
UF0524 # 01 Y:2019 | 01 | 2019 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $371,464 | $1,750,000 | Not Implemented |
UF0524 # 02 Y:2019 | 02 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $212,420 | $75,000 | Not Implemented |
UF0524 # 03 Y:2019 | 03 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $62,330 | $139,780 | Implemented |
UF0524 # 04 Y:2019 | 04 | 2019 | INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN | $22,663 | $18,928 | Not Implemented |
UF0524 # 05 Y:2019 | 05 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $19,167 | $89,865 | Not Implemented |