IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,636

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0214 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $3,765 $3,400 Not Implemented
MS0214 # 05 Y:2002 05 2002 INSTALL SPECTRAL REFLECTORS / DELAMP $2,288 $270 Implemented
MS0214 # 06 Y:2002 06 2002 DISCONNECT BALLASTS $1,230 $1,395 Implemented
MS0214 # 07 Y:2002 07 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,517 $1,416 Not Implemented
MS0214 # 08 Y:2002 08 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $582 $0 Implemented
MS0214 # 09 Y:2002 09 2002 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $557 $200 Implemented
MS0214 # 10 Y:2002 10 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $6,462 $6,610 Not Implemented
MS0214 # 11 Y:2002 11 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $38,952 $153,600 Not Implemented
MS0213 # 01 Y:2002 01 2002 INSTALL TIMERS AND/OR THERMOSTATS $23,960 $13,625 Not Implemented
MS0213 # 02 Y:2002 02 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,282 $0 Not Implemented
MS0213 # 03 Y:2002 03 2002 DISCONNECT BALLASTS $1,168 $660 Not Implemented
MS0213 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,110 $227 Not Implemented
MS0213 # 05 Y:2002 05 2002 INSULATE BARE EQUIPMENT $377 $455 Not Implemented
MS0213 # 06 Y:2002 06 2002 REUSE / RECYCLE/ SELL PAPER PRODUCTS $15,739 $22,000 Not Implemented
MS0212 # 01 Y:2002 01 2002 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $1,698 $1,707 Not Implemented
MS0212 # 02 Y:2002 02 2002 USE SYNTHETIC LUBRICANT $1,158 $760 Not Implemented
MS0212 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $982 $477 Implemented
MS0212 # 04 Y:2002 04 2002 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $29,000 $79,245 Implemented
MS0211 # 01 Y:2002 01 2002 RECOVER WASTE HEAT FROM EQUIPMENT $2,096 $1,739 Not Implemented
MS0211 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,516 $577 Implemented
MS0211 # 03 Y:2002 03 2002 RECOVER WASTE HEAT FROM EQUIPMENT $864 $2,540 Not Implemented
MS0211 # 04 Y:2002 04 2002 INSTALL TIMERS AND/OR THERMOSTATS $675 $472 Implemented
MS0211 # 05 Y:2002 05 2002 DISCONNECT BALLASTS $442 $255 Implemented
MS0211 # 06 Y:2002 06 2002 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $48,814 $175,000 Not Implemented
MS0210 # 01 Y:2002 01 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $24,185 $100 Implemented