IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0969 # 14 Y:2017 14 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,321 $811 Implemented
UD0968 # 01 Y:2017 01 2017 REDUCE EXCESSIVE BOILER BLOWDOWN $8,230 $0 Not Implemented
UD0968 # 02 Y:2017 02 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,800 $0 Not Implemented
UD0968 # 03 Y:2017 03 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,341 $0 Implemented
UD0968 # 04 Y:2017 04 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,217 $118 Implemented
UD0968 # 05 Y:2017 05 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $0 Implemented
UD0968 # 06 Y:2017 06 2017 USE COUNTER-CURRENT RINSING TO REDUCE RINSE WATER VOLUME (GRAVURE) $87,734 $2,000 Not Implemented
UD0968 # 07 Y:2017 07 2017 OPTIMIZE PLANT POWER FACTOR $61,075 $28,000 Not Implemented
UD0968 # 08 Y:2017 08 2017 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $909,400 $750,000 Not Implemented
UD0968 # 09 Y:2017 09 2017 COVER OPEN TANKS $234,848 $564,850 Not Implemented
UD0968 # 10 Y:2017 10 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80,368 $6,000 Not Implemented
UD0968 # 11 Y:2017 11 2017 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $68,688 $12,000 Not Implemented
UD0968 # 12 Y:2017 12 2017 INSULATE BARE EQUIPMENT $31,081 $33,760 Not Implemented
UD0968 # 13 Y:2017 13 2017 USE OPTIMUM TEMPERATURE $4,293 $0 Implemented
UD0968 # 14 Y:2017 14 2017 INSTALL / REPAIR INSULATION ON STEAM LINES $687 $1,810 Not Implemented
UD0968 # 15 Y:2017 15 2017 USE OPTIMUM THICKNESS INSULATION $162 $344 Not Implemented
UD0968 # 16 Y:2017 16 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,850 $38,175 Implemented
UD0968 # 17 Y:2017 17 2017 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $27,353 $42,400 Implemented
WV0546 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,125 $26,267 Implemented
WV0546 # 02 Y:2017 02 2017 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,220 $1,000 Not Implemented
WV0546 # 03 Y:2017 03 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,180 $11,575 Implemented
WV0546 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,920 $4,595 Implemented
WV0546 # 05 Y:2017 05 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,190 $854 Not Implemented
WV0546 # 06 Y:2017 06 2017 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,152 $6,100 Implemented
WV0546 # 07 Y:2017 07 2017 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,898 $0 Implemented