Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,851
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0112 # 03 Y:2013 | 03 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $145 | $700 | Implemented |
TT0112 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,571 | $25,960 | Implemented |
TT0112 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,801 | $5,122 | Implemented |
TT0112 # 06 Y:2013 | 06 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $54 | $394 | Implemented |
TT0112 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,345 | $15,200 | Not Implemented |
TT0115 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,000 | $50,000 | Implemented |
TT0115 # 02 Y:2013 | 02 | 2013 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $18,000 | $50,000 | Implemented |
TT0115 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,000 | $50,000 | Not Implemented |
TT0115 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $32,990 | $129,250 | Not Implemented |
TT0115 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $146,360 | $450,000 | Not Implemented |
TT0115 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,000 | $4,000 | Not Implemented |
TT0115 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,635 | $2,500 | Not Implemented |
TT0115 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,984 | $20,000 | Not Implemented |
TT0115 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,635 | $20,000 | Not Implemented |
TT0114 # 01 Y:2013 | 01 | 2013 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $7,820 | $0 | Implemented |
TT0114 # 02 Y:2013 | 02 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42 | $0 | Implemented |
TT0114 # 03 Y:2013 | 03 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $13,529 | $125 | Implemented |
TT0114 # 04 Y:2013 | 04 | 2013 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $6,310 | $9,125 | Not Implemented |
TT0114 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $360 | $315 | Implemented |
TT0114 # 06 Y:2013 | 06 | 2013 | INSTALL OCCUPANCY SENSORS | $6,033 | $5,950 | Implemented |
TT0114 # 07 Y:2013 | 07 | 2013 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $7,988 | $15,000 | Not Implemented |
TT0109 # 01 Y:2013 | 01 | 2013 | ADJUST BURNERS FOR EFFICIENT OPERATION | $3,611 | $50 | Implemented |
TT0109 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $17,524 | $25,600 | Not Implemented |
TT0109 # 03 Y:2013 | 03 | 2013 | UPGRADE CONTROLS ON COMPRESSORS | $7,651 | $25 | Implemented |
TT0109 # 04 Y:2013 | 04 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,206 | $63 | Implemented |