Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,533
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0100 # 01 Y:2005 | 01 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $136,425 | $38,485 | Not Implemented |
TA0100 # 02 Y:2005 | 02 | 2005 | INSULATE BARE EQUIPMENT | $15,690 | $1,015 | Implemented |
TA0100 # 03 Y:2005 | 03 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $14,111 | $7,705 | Not Implemented |
TA0100 # 04 Y:2005 | 04 | 2005 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $3,280 | $1,485 | Not Implemented |
TA0100 # 05 Y:2005 | 05 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,925 | $205 | Implemented |
TA0100 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $2,400 | $995 | Implemented |
TA0100 # 07 Y:2005 | 07 | 2005 | INSULATE BARE EQUIPMENT | $1,530 | $570 | Implemented |
TA0100 # 08 Y:2005 | 08 | 2005 | DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING | $850 | $0 | Implemented |
TA0100 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $965 | $200 | Implemented |
TA0100 # 10 Y:2005 | 10 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $500 | $0 | Implemented |
UD0725 # 01 Y:2005 | 01 | 2005 | RECOVER AND REUSE WASTE MATERIAL | $45,000 | $50,000 | Not Implemented |
UD0725 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $10,989 | $792 | Not Implemented |
UD0725 # 03 Y:2005 | 03 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,863 | $28,350 | Implemented |
UD0725 # 04 Y:2005 | 04 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,772 | $18,444 | Implemented |
UD0725 # 05 Y:2005 | 05 | 2005 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,315 | $1,320 | Implemented |
UD0725 # 06 Y:2005 | 06 | 2005 | INSULATE BARE EQUIPMENT | $4,269 | $3,192 | Not Implemented |
UD0725 # 07 Y:2005 | 07 | 2005 | OPTIMIZE PLANT POWER FACTOR | $3,254 | $10,800 | Not Implemented |
UD0725 # 08 Y:2005 | 08 | 2005 | INSULATE BARE EQUIPMENT | $1,968 | $0 | Implemented |
UD0725 # 09 Y:2005 | 09 | 2005 | INSTALL OCCUPANCY SENSORS | $1,788 | $728 | Implemented |
UD0725 # 10 Y:2005 | 10 | 2005 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $632 | $1,170 | Not Implemented |
UD0725 # 11 Y:2005 | 11 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $564 | $296 | Not Implemented |
MI0116 # 01 Y:2005 | 01 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,754 | $2,512 | Implemented |
MI0116 # 02 Y:2005 | 02 | 2005 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $39,673 | $4,275 | Not Implemented |
MI0116 # 03 Y:2005 | 03 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,648 | $1,074 | Implemented |
MI0116 # 04 Y:2005 | 04 | 2005 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,032 | $56 | Not Implemented |