IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,666

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0364 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $27,695 $55,216 Not Implemented
BD0364 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $2,782 $2,025 Not Implemented
BD0364 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $3,526 $1,000 Not Implemented
BD0364 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $327 $0 Not Implemented
BD0364 # 05 Y:2009 05 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $118 $500 Not Implemented
BD0364 # 06 Y:2009 06 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $193 $300 Not Implemented
BD0364 # 07 Y:2009 07 2009 USE RADIANT HEATER FOR SPOT HEATING $4,732 $8,000 Not Implemented
BD0364 # 08 Y:2009 08 2009 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,047 $800 Not Implemented
BD0364 # 09 Y:2009 09 2009 MODIFY STARTUP/SHUTDOWN TIMES $418 $0 Not Implemented
MI0179 # 01 Y:2009 01 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $41,487 $31,140 Not Implemented
MI0179 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,203 $31,350 Not Implemented
MI0179 # 03 Y:2009 03 2009 TURN OFF EQUIPMENT WHEN NOT IN USE $23,952 $3,320 Implemented
MI0179 # 04 Y:2009 04 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,351 $1,210 Implemented
MI0179 # 05 Y:2009 05 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,234 $4,531 Not Implemented
MI0179 # 06 Y:2009 06 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,117 $40 Implemented
UF0424 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $53,117 $28,843 Not Implemented
UF0424 # 02 Y:2009 02 2009 INSTALL OCCUPANCY SENSORS $151 $562 Not Implemented
UF0424 # 03 Y:2009 03 2009 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $11,733 $397 Not Implemented
UF0424 # 04 Y:2009 04 2009 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,063 $425 Not Implemented
UF0424 # 05 Y:2009 05 2009 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $31,025 $24,740 Not Implemented
UF0424 # 06 Y:2009 06 2009 REDUCE HEAT GAIN BY WINDOW TINTING $790 $800 Not Implemented
UF0424 # 07 Y:2009 07 2009 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $512 $2,500 Not Implemented
UF0424 # 08 Y:2009 08 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $1,080 $512 Not Implemented
UF0424 # 09 Y:2009 09 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,732 $564 Not Implemented
UF0424 # 10 Y:2009 10 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,752 $300 Not Implemented