IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0420 # 01 Y:2012 01 2012 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $113,599 $0 Not Implemented
SF0420 # 02 Y:2012 02 2012 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $17,363 $0 Not Implemented
SF0420 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,156 $840 Implemented
SF0420 # 04 Y:2012 04 2012 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $44,796 $12,500 Not Implemented
SF0420 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $936 $555 Implemented
SF0420 # 06 Y:2012 06 2012 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $2,415 $2,286 Not Implemented
SF0420 # 07 Y:2012 07 2012 INCREASE AMOUNT OF CONDENSATE RETURNED $13,612 $13,418 Not Implemented
SF0420 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $53,028 $57,435 Not Implemented
SF0420 # 09 Y:2012 09 2012 BURN A LESS EXPENSIVE GRADE OF FUEL $52,423 $78,900 Not Implemented
SF0420 # 10 Y:2012 10 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,461 $9,543 Not Implemented
SF0420 # 11 Y:2012 11 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $147,442 $498,340 Not Implemented
SF0420 # 12 Y:2012 12 2012 MINIMIZE WATER USAGE $5,598 $0 Not Implemented
SF0420 # 13 Y:2012 13 2012 MINIMIZE WATER USAGE $677 $0 Not Implemented
CO0663 # 01 Y:2012 01 2012 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $17,080 $500 Implemented
CO0663 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,450 $32,050 Implemented
CO0663 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,190 $34,790 Implemented
CO0663 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $5,150 $11,150 Not Implemented
CO0663 # 05 Y:2012 05 2012 USE SOLAR HEAT TO MAKE ELECTRICTY $2,770 $32,500 Not Implemented
MAS027 # 01 Y:2012 01 2012 REDUCE VENTILATION AIR $23,907 $33,500 Not Implemented
MAS027 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $11,449 $28,000 Not Implemented
MAS027 # 03 Y:2012 03 2012 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $2,336 $500 Not Implemented
UA3022 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $54,140 $50 Not Implemented
UA3022 # 02 Y:2012 02 2012 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $31,511 $15,063 Not Implemented
UA3022 # 03 Y:2012 03 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $12,180 $50 Not Implemented
UA3022 # 04 Y:2012 04 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $64,995 $90,750 Not Implemented