IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

143,273

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0173 # 04 Y:1993 04 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,897 $5,062 Not Implemented
OR0173 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $370 $1,036 Not Implemented
OR0173 # 06 Y:1993 06 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $354 $1,000 Not Implemented
OR0173 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,092 $3,525 Not Implemented
OR0173 # 08 Y:1993 08 1993 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,338 $41,360 Not Implemented
OK0400 # 01 Y:1993 01 1993 INSTALL SET-BACK TIMERS $10,933 $1,316 Implemented
OK0400 # 02 Y:1993 02 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $3,801 $2,000 Not Implemented
OK0400 # 03 Y:1993 03 1993 RECOVER WASTE HEAT FROM EQUIPMENT $925 $192 Not Implemented
OK0400 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $653 $0 Implemented
OK0400 # 05 Y:1993 05 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $229 $0 Implemented
OK0400 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $188 $258 Implemented
MO0082 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,825 $31,211 Implemented
MO0082 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $19,474 $1,430 Implemented
MO0082 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,548 $554 Not Implemented
MO0082 # 04 Y:1993 04 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,256 $45,107 Implemented
MO0082 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,980 $2,627 Implemented
MO0082 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,722 $790 Not Implemented
MO0082 # 07 Y:1993 07 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,845 $60 Implemented
MO0082 # 08 Y:1993 08 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $11,296 $1,695 Not Implemented
SD0053 # 02 Y:1993 02 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,892 $6,584 Implemented
SD0053 # 03 Y:1993 03 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,557 $19,600 Implemented
SD0053 # 04 Y:1993 04 1993 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,738 $280 Not Implemented
SD0053 # 05 Y:1993 05 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,579 $3,520 Not Implemented
SD0053 # 01 Y:1993 01 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,264 $1,803 Implemented
AM0178 # 01 Y:1993 01 1993 OPTIMIZE PLANT POWER FACTOR $48,960 $72,000 Not Implemented