IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

146,354

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0199 # 05 Y:1986 05 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $906 $34 Implemented
KU0199 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $600 $200 Implemented
KU0199 # 07 Y:1986 07 1986 KEEP BOILER TUBES CLEAN $112 $100 Not Implemented
KU0199 # 08 Y:1986 08 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $80 $0 Not Implemented
KU0200 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,229 $14,500 Implemented
KU0200 # 02 Y:1986 02 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,130 $1,000 Implemented
KU0200 # 03 Y:1986 03 1986 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,694 $0 Implemented
KU0200 # 04 Y:1986 04 1986 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $473 $0 Implemented
KU0200 # 05 Y:1986 05 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $198 $0 Implemented
KU0200 # 06 Y:1986 06 1986 ADD AIR SHIELDS TO TRUCKS TO INCREASE FUEL MILEAGE $216 $0 Not Implemented
KU0200 # 07 Y:1986 07 1986 RECOVER WASTE HEAT FROM EQUIPMENT $116 $150 Implemented
OK0195 # 01 Y:1986 01 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,989 $500 Implemented
OK0195 # 02 Y:1986 02 1986 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $2,085 $214 Not Implemented
OK0195 # 03 Y:1986 03 1986 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,520 $3,000 Implemented
OK0195 # 04 Y:1986 04 1986 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $12,902 $0 Implemented
OK0195 # 05 Y:1986 05 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $1,289 $1,200 Implemented
OK0195 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $582 $0 Implemented
OK0195 # 07 Y:1986 07 1986 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $2,030 $1,200 Implemented
OK0196 # 01 Y:1986 01 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,521 $0 Implemented
OK0196 # 02 Y:1986 02 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $693 $1,821 Implemented
OK0196 # 03 Y:1986 03 1986 USE RADIANT HEATER FOR SPOT HEATING $7,663 $36,000 Not Implemented
OK0197 # 01 Y:1986 01 1986 MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT $2,964 $3,200 Implemented
OK0197 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $369 $360 Not Implemented
OK0197 # 03 Y:1986 03 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,954 $1,500 Not Implemented
OK0197 # 04 Y:1986 04 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $547 $80 Implemented