IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,615

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
ME0135 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $5,700 $4,000 Not Implemented
ME0135 # 04 Y:1994 04 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $760 $600 Not Implemented
ME0135 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,600 $5,300 Not Implemented
ME0135 # 06 Y:1994 06 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,146 $500 Not Implemented
ME0135 # 07 Y:1994 07 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,900 $600 Implemented
ME0135 # 08 Y:1994 08 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $692 $0 Not Implemented
ME0137 # 01 Y:1994 01 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $42,534 $50,000 Not Implemented
ME0137 # 02 Y:1994 02 1994 USE OPTIMUM THICKNESS INSULATION $22,500 $4,500 Not Implemented
ME0137 # 03 Y:1994 03 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $35,300 $70,000 Not Implemented
ME0137 # 04 Y:1994 04 1994 OPTIMIZE PLANT POWER FACTOR $9,485 $9,080 Not Implemented
ME0137 # 05 Y:1994 05 1994 METER WASTE WATER $18,700 $1,350 Not Implemented
ME0137 # 06 Y:1994 06 1994 REDUCE FLUID FLOW RATES $1,088 $1,010 Not Implemented
ME0137 # 07 Y:1994 07 1994 RECOVER WASTE HEAT FROM EQUIPMENT $6,915 $30,000 Not Implemented
ME0136 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,212 $600 n/a
ME0136 # 02 Y:1994 02 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,058 $400 n/a
ME0136 # 03 Y:1994 03 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $600 $50 n/a
ME0136 # 04 Y:1994 04 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,772 $20 n/a
ME0136 # 05 Y:1994 05 1994 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,959 $2,584 n/a
ME0136 # 06 Y:1994 06 1994 INSULATE BARE EQUIPMENT $520 $130 n/a
ME0136 # 07 Y:1994 07 1994 INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS $1,300 $900 n/a
ME0136 # 08 Y:1994 08 1994 REPAIR OR REPLACE STEAM TRAPS $2,150 $300 n/a
ME0134 # 01 Y:1994 01 1994 INSTALL OCCUPANCY SENSORS $300 $150 Implemented
ME0134 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,500 $1,050 Not Implemented
ME0134 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,743 $400 Implemented
ME0134 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $598 $300 Implemented