IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0397 # 03 Y:2015 03 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,396 $1,000 Implemented
LE0397 # 04 Y:2015 04 2015 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,238 $5,500 Not Implemented
LE0397 # 05 Y:2015 05 2015 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $4,917 $14,900 Not Implemented
LE0397 # 06 Y:2015 06 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $1,914 Implemented
DL0146 # 01 Y:2015 01 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $6,880 $1,000 Implemented
DL0146 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $730 $100 Implemented
DL0146 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $1,425 Not Implemented
DL0146 # 04 Y:2015 04 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $27,520 $125,000 Not Implemented
LE0395 # 01 Y:2015 01 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $3,054 $0 Not Implemented
LE0395 # 02 Y:2015 02 2015 INSTALL TIMERS AND/OR THERMOSTATS $8,822 $0 Not Implemented
LE0395 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,519 $40 Not Implemented
LE0395 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,637 $1,000 Not Implemented
LE0395 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $566 $240 Not Implemented
LE0395 # 06 Y:2015 06 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $292 $183 Not Implemented
LE0395 # 07 Y:2015 07 2015 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $1,372 $1,200 Not Implemented
LE0395 # 08 Y:2015 08 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $19,541 $18,800 Not Implemented
LE0395 # 09 Y:2015 09 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,966 $3,000 Not Implemented
LE0395 # 10 Y:2015 10 2015 INSTALL OCCUPANCY SENSORS $224 $450 Not Implemented
LE0395 # 11 Y:2015 11 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,768 $8,250 Not Implemented
LE0395 # 12 Y:2015 12 2015 INSTALL TIMERS AND/OR THERMOSTATS $4,108 $9,000 Not Implemented
LE0395 # 13 Y:2015 13 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,525 $1,500 Not Implemented
LE0395 # 14 Y:2015 14 2015 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $13,437 $64,250 Not Implemented
LE0395 # 15 Y:2015 15 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,025 $41,790 Not Implemented
LE0391 # 01 Y:2015 01 2015 REPAIR OR REPLACE STEAM TRAPS $22,916 $1,170 Implemented
LE0391 # 02 Y:2015 02 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $703 $70 Not Implemented