IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

6,055

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0342 # 02 Y:1995 02 1995 USE ADSORPTION, ION EXCHANGE TO REMOVE CONTAMINANTS $56,560 $174,500 Not Implemented
CO0342 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,910 $13,270 Implemented
CO0342 # 04 Y:1995 04 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,190 $1,240 Implemented
CO0342 # 05 Y:1995 05 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,000 $720 Not Implemented
CO0342 # 06 Y:1995 06 1995 RECOVER WASTE HEAT FROM EQUIPMENT $820 $600 Implemented
CO0342 # 07 Y:1995 07 1995 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $530 $0 Implemented
IA0126 # 01 Y:1995 01 1995 UPGRADE OBSOLETE EQUIPMENT $43,805 $124,000 Implemented
IA0126 # 02 Y:1995 02 1995 REDUCE VENTILATION AIR $2,054 $975 Implemented
IA0126 # 03 Y:1995 03 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,064 $25 Not Implemented
IA0126 # 04 Y:1995 04 1995 RECOVER WASTE HEAT FROM EQUIPMENT $886 $320 Not Implemented
IA0126 # 05 Y:1995 05 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $967 $2,222 Implemented
IA0126 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $1,238 $2,071 Implemented
IA0126 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,106 $2,454 Not Implemented
IA0126 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,304 $341 Implemented
IA0125 # 01 Y:1995 01 1995 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $38,625 $95,200 Not Implemented
IA0125 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,391 $1,567 Implemented
IA0125 # 03 Y:1995 03 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,854 $22 Implemented
IA0125 # 04 Y:1995 04 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $416 $175 Not Implemented
IA0125 # 05 Y:1995 05 1995 USE SYNTHETIC LUBRICANT $267 $870 Not Implemented
IA0125 # 06 Y:1995 06 1995 INSTALL OCCUPANCY SENSORS $511 $1,743 Not Implemented
IA0125 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $499 $371 Implemented
IA0125 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $352 $484 Not Implemented
IA0125 # 09 Y:1995 09 1995 DIRECT WARMEST AIR TO COMBUSTION INTAKE $691 $500 Not Implemented
AS0159 # 01 Y:1995 01 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $14,313 $11,527 Implemented
AS0159 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,148 $0 Not Implemented