IAC Assessment: AS0159
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: AS0159
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Arizona State University
Assessment Year 1995
Principal Product Polyvinyl Chloride Pipe
NAICS n/a
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 53
Plant Area (Sq.Ft.) 65,000
Annual Production 55,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) AZ
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $459,773 7,448,711 kWh $0.06
TOTAL ENERGY COSTS $459,773
RECOMMENDED SAVINGS* $74,213 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $43,929
#|Description Savings
Cost
Status Electricity Usage Electricity Usage
$ kWh
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$14,313
Cost:
$11,527
$14,313 260,258 $14,313
260,258
kWh
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,148
Cost:
-
$5,148 92,907 $5,148
92,907
kWh
03: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$7,700
Cost:
$50
$7,700 - $7,700
-
kWh
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$13,333
Cost:
$650
$13,333 247,948 $13,333
247,948
kWh
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$5,086
Cost:
$5,202
$5,086 38,980 $5,086
38,980
kWh
06: 2.2614 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING Savings:
$4,366
Cost:
$20,000
$4,366 93,200 $4,366
93,200
kWh
07: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$11,926
Cost:
$31,350
$11,926 212,485 $11,926
212,485
kWh
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,844
Cost:
$6,860
$8,844 163,247 $8,844
163,247
kWh
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,497
Cost:
$12,300
$3,497 65,064 $3,497
65,064
kWh
TOTAL RECOMMENDED Savings:
$74,213
Cost:
$87,939
$74,213 1,174,089 $74,213
1,174,089
kWh
TOTAL IMPLEMENTED Savings:
$43,929
Cost:
$29,729
$43,929 612,250 $43,929
612,250
kWh
Savings
Cost
$ kWh
Electricity Usage Electricity Usage