Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
146,354
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0010 # 05 Y:1984 | 05 | 1984 | OPERATE BOILERS ON HIGH FIRE SETTING | $3,110 | $4,000 | Implemented |
MA0010 # 06 Y:1984 | 06 | 1984 | HEAT WATER WITH EXHAUST HEAT | $16,603 | $22,000 | Not Implemented |
MA0010 # 07 Y:1984 | 07 | 1984 | RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS | $2,680 | $8,130 | Implemented |
MA0011 # 01 Y:1984 | 01 | 1984 | INSULATE BARE EQUIPMENT | $1,481 | $426 | Implemented |
MA0011 # 02 Y:1984 | 02 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,985 | $548 | Implemented |
MA0011 # 03 Y:1984 | 03 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $303 | $200 | Implemented |
MA0011 # 04 Y:1984 | 04 | 1984 | REPAIR OR REPLACE STEAM TRAPS | $1,051 | $1,400 | Implemented |
MA0011 # 05 Y:1984 | 05 | 1984 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $86 | $185 | Implemented |
MA0012 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,078 | $100 | Implemented |
MA0012 # 02 Y:1984 | 02 | 1984 | INSULATE BARE EQUIPMENT | $40 | $25 | Implemented |
MA0012 # 03 Y:1984 | 03 | 1984 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $422 | $550 | Implemented |
ST0009 # 01 Y:1984 | 01 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,275 | $212 | Not Implemented |
ST0009 # 02 Y:1984 | 02 | 1984 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $201 | $537 | Implemented |
ST0009 # 03 Y:1984 | 03 | 1984 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $50 | $0 | Implemented |
ST0009 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $136 | $0 | Implemented |
ST0009 # 05 Y:1984 | 05 | 1984 | INSTALL / REPAIR INSULATION ON STEAM LINES | $40 | $50 | Implemented |
ST0009 # 06 Y:1984 | 06 | 1984 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $32 | $28 | Not Implemented |
ST0009 # 07 Y:1984 | 07 | 1984 | INSTALL AUTOMATIC STACK DAMPER | $251 | $60 | Not Implemented |
ST0009 # 08 Y:1984 | 08 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,149 | $0 | Implemented |
ST0009 # 09 Y:1984 | 09 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $679 | $130 | Not Implemented |
ST0009 # 10 Y:1984 | 10 | 1984 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $370 | $750 | Not Implemented |
ST0010 # 01 Y:1984 | 01 | 1984 | BURN WASTE PAPER FOR HEAT | $17,516 | $25,000 | Not Implemented |
ST0010 # 02 Y:1984 | 02 | 1984 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,173 | $0 | Implemented |
ST0010 # 03 Y:1984 | 03 | 1984 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,071 | $429 | Implemented |
ST0010 # 04 Y:1984 | 04 | 1984 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $930 | $0 | Implemented |