Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UK1313 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $74,025 | $55,000 | Not Implemented |
UK1313 # 07 Y:2013 | 07 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $7,011 | $0 | Implemented |
UK1313 # 08 Y:2013 | 08 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $2,313 | $0 | Implemented |
UK1313 # 09 Y:2013 | 09 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,246 | $3,000 | Not Implemented |
UK1313 # 10 Y:2013 | 10 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $695 | $0 | Not Implemented |
UK1313 # 11 Y:2013 | 11 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,284 | $15,000 | Implemented |
UK1313 # 12 Y:2013 | 12 | 2013 | TURN OFF EQUIPMENT WHEN NOT IN USE | $20,092 | $0 | Implemented |
UK1313 # 13 Y:2013 | 13 | 2013 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $10,444 | $4,500 | Not Implemented |
UK1313 # 14 Y:2013 | 14 | 2013 | DEVELOP A REPAIR/REPLACE POLICY | $3,770 | $9,750 | Implemented |
UK1313 # 15 Y:2013 | 15 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $913 | $2,119 | Not Implemented |
UK1313 # 16 Y:2013 | 16 | 2013 | INSULATE BARE EQUIPMENT | $6,807 | $894 | Not Implemented |
UK1313 # 17 Y:2013 | 17 | 2013 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $1,679 | $5,000 | Not Implemented |
UK1313 # 18 Y:2013 | 18 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $21,538 | $2,500 | Not Implemented |
UK1313 # 19 Y:2013 | 19 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $252,538 | $210,000 | Implemented |
UK1313 # 20 Y:2013 | 20 | 2013 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $412 | $0 | Implemented |
UK1313 # 21 Y:2013 | 21 | 2013 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $4,400 | $0 | Implemented |
UK1312 # 01 Y:2013 | 01 | 2013 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $138,049 | $23,400 | Not Implemented |
UK1312 # 02 Y:2013 | 02 | 2013 | UPGRADE OBSOLETE EQUIPMENT | $54,717 | $520,000 | Implemented |
UK1312 # 03 Y:2013 | 03 | 2013 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $23,264 | $5,000 | Implemented |
UK1312 # 04 Y:2013 | 04 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,416 | $6,400 | Not Implemented |
UK1312 # 05 Y:2013 | 05 | 2013 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,570 | $504 | Implemented |
UK1312 # 06 Y:2013 | 06 | 2013 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,527 | $1,376 | Implemented |
UK1312 # 07 Y:2013 | 07 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,529 | $2,581 | Not Implemented |
UK1312 # 08 Y:2013 | 08 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,121 | $2,121 | Not Implemented |
UK1312 # 09 Y:2013 | 09 | 2013 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $815 | $0 | Implemented |