IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0769 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $4,100 $9,520 Not Implemented
AM0769 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,580 $6,560 Implemented
AM0769 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,950 $11 Implemented
AM0769 # 05 Y:2019 05 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,065 $500 Implemented
AM0769 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $510 $125 Not Implemented
AM0769 # 07 Y:2019 07 2019 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $420 $0 Implemented
AM0769 # 08 Y:2019 08 2019 INSULATE BARE EQUIPMENT $350 $144 Not Implemented
AM0769 # 09 Y:2019 09 2019 INSTALL OCCUPANCY SENSORS $320 $100 Implemented
AM0768 # 01 Y:2019 01 2019 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $4,120 $0 Implemented
AM0768 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,730 $1,000 Implemented
AM0768 # 03 Y:2019 03 2019 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,910 $0 Implemented
AM0768 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,600 $3,900 Not Implemented
AM0768 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,070 $13 Implemented
AM0768 # 06 Y:2019 06 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $615 Not Implemented
AM0768 # 07 Y:2019 07 2019 USE PHOTOCELL CONTROLS $390 $500 Implemented
AM0768 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $360 $133 Implemented
AM0767 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $26,170 $10,000 Implemented
AM0767 # 02 Y:2019 02 2019 OPTIMIZE PLANT POWER FACTOR $20,800 $48,700 Not Implemented
AM0767 # 03 Y:2019 03 2019 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $17,710 $5,110 Not Implemented
AM0767 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,360 $32,745 Implemented
AM0767 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,840 $12 Not Implemented
AM0767 # 06 Y:2019 06 2019 REUSE RAGS UNTIL COMPLETELY SOILED $1,520 $0 Not Implemented
AM0766 # 01 Y:2018 01 2018 OPTIMIZE PLANT POWER FACTOR $17,280 $17,230 Not Implemented
AM0766 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $13,320 $2,000 Not Implemented
AM0766 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,120 $1,000 Not Implemented