IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UF0414 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,527 $7,379 Implemented
UF0414 # 02 Y:2008 02 2008 REDUCE DELIVERY SCHEDULES $89,700 $6,652 Not Implemented
UF0414 # 03 Y:2008 03 2008 OPTIMIZE PLANT POWER FACTOR $44,500 $13,000 Implemented
UF0414 # 04 Y:2008 04 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,808 $15,562 Implemented
UF0414 # 05 Y:2008 05 2008 INSTALL OCCUPANCY SENSORS $255 $39 Implemented
UF0414 # 06 Y:2008 06 2008 REPAIR AND ELIMINATE STEAM LEAKS $2,447 $371 Implemented
UF0414 # 07 Y:2008 07 2008 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $13,994 $10,000 Not Implemented
UF0414 # 08 Y:2008 08 2008 BURN A LESS EXPENSIVE GRADE OF FUEL $217,282 $100,000 Not Implemented
MA0642 # 01 Y:2008 01 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,279 $27,924 Implemented
MA0642 # 02 Y:2008 02 2008 RECOVER WASTE HEAT FROM EQUIPMENT $4,095 $4,354 Not Implemented
MA0642 # 03 Y:2008 03 2008 REDUCE VENTILATION AIR $3,315 $1,000 Not Implemented
MA0642 # 04 Y:2008 04 2008 OPTIMIZE PLANT POWER FACTOR $1,935 $6,500 Not Implemented
MA0642 # 05 Y:2008 05 2008 DIRECT WARMEST AIR TO COMBUSTION INTAKE $1,273 $5,500 Not Implemented
MA0642 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $391 $900 Not Implemented
MA0642 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $251 $120 Implemented
SF0361 # 01 Y:2008 01 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $6,816 $0 Implemented
SF0361 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $701 $0 Implemented
SF0361 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $237 $162 Implemented
SF0361 # 04 Y:2008 04 2008 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,199 $713 Implemented
SF0361 # 05 Y:2008 05 2008 INSULATE BARE EQUIPMENT $1,614 $1,036 Implemented
SF0361 # 06 Y:2008 06 2008 HEAT WATER WITH EXHAUST HEAT $24,668 $16,423 Not Implemented
SF0361 # 07 Y:2008 07 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,413 $4,592 Implemented
SF0361 # 08 Y:2008 08 2008 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,039 $1,502 Not Implemented
MZ0022 # 01 Y:2008 01 2008 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT $1,425 $2,800 Implemented
MZ0022 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $382 $900 Implemented