IAC logo
IAC Assessment: UF0414
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UF0414
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Florida
Assessment Year 2008
Principal Product soy milk
NAICS 311514 - Dry, Condensed, and Evaporated Dairy Product Manufacturing
SIC 2023 - Dry, Condensed, Evaporated Products
Sales $10,000,000-$50,000,000
# of Employees 101
Plant Area (Sq.Ft.) 12,000
Annual Production 17,000,000 Pieces
Production Hrs. Annual 8,740
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $156,928 2,172,221 kWh $0.07
Natural Gas $183,384 17,235 MMBtu $10.64
TOTAL ENERGY COSTS $340,312
RECOMMENDED SAVINGS* $378,513 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,537
#|Description Savings
Cost
Status Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,527
Cost:
$7,379
$4,527 63,000 - - - - $4,527
63,000
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.8212 REDUCE DELIVERY SCHEDULES Savings:
$89,700
Cost:
$6,652
- - - - $89,700 1 -
-
kWh
-
-
MMBtu
$89,700
1
MMBtu
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$44,500
Cost:
$13,000
$44,500 - - - - - $44,500
-
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,808
Cost:
$15,562
$5,808 75,556 - - - - $5,808
75,556
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$255
Cost:
$39
$255 3,983 - - - - $255
3,983
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,447
Cost:
$371
- - $2,447 230 - - -
-
kWh
$2,447
230
MMBtu
-
-
MMBtu
07: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$13,994
Cost:
$10,000
- - $13,994 1,320 - - -
-
kWh
$13,994
1,320
MMBtu
-
-
MMBtu
08: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$217,282
Cost:
$100,000
- - $217,282 13,140 - - -
-
kWh
$217,282
13,140
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$378,513
Cost:
$153,003
$55,090 142,539 $233,723 14,690 $89,700 1 $55,090
142,539
kWh
$233,723
14,690
MMBtu
$89,700
1
MMBtu
TOTAL IMPLEMENTED Savings:
$57,537
Cost:
$36,351
$55,090 142,539 $2,447 230 - - $55,090
142,539
kWh
$2,447
230
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Other Energy Electricity Usage Natural Gas Other Energy