Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
122,146
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0493 # 04 Y:2013 | 04 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,550 | $1,386 | Implemented |
NC0493 # 05 Y:2013 | 05 | 2013 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $37,850 | $6,372 | Implemented |
NC0493 # 06 Y:2013 | 06 | 2013 | INSULATE BARE EQUIPMENT | $15,385 | $1,820 | Not Implemented |
NC0493 # 07 Y:2013 | 07 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $853 | $1,447 | Not Implemented |
NC0493 # 08 Y:2013 | 08 | 2013 | INCREASE AMOUNT OF CONDENSATE RETURNED | $13,410 | $10,000 | Not Implemented |
NC0493 # 09 Y:2013 | 09 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $430 | $0 | Implemented |
NC0493 # 10 Y:2013 | 10 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,165 | $100 | Implemented |
NC0493 # 11 Y:2013 | 11 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,410 | $15,000 | Not Implemented |
NC0493 # 12 Y:2013 | 12 | 2013 | TREAT AND REUSE RINSE WATERS | $28,586 | $90,000 | Not Implemented |
NC0493 # 13 Y:2013 | 13 | 2013 | CONDENSE OPERATION INTO ONE BUILDING | $21,473 | $10,000 | Implemented |
BS0020 # 01 Y:2013 | 01 | 2013 | REDESIGN PROCESS | $15,024 | $15,359 | Not Implemented |
BS0020 # 02 Y:2013 | 02 | 2013 | OPTIMIZE PLANT POWER FACTOR | $18,318 | $19,262 | Implemented |
BS0020 # 03 Y:2013 | 03 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,893 | $71,307 | Implemented |
BS0020 # 04 Y:2013 | 04 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,831 | $15,600 | Implemented |
BS0020 # 05 Y:2013 | 05 | 2013 | INSULATE BARE EQUIPMENT | $9,887 | $5,300 | Implemented |
BS0020 # 06 Y:2013 | 06 | 2013 | COVER OPEN TANKS | $3,845 | $6,050 | Not Implemented |
TT0115 # 01 Y:2013 | 01 | 2013 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $18,000 | $50,000 | Implemented |
TT0115 # 02 Y:2013 | 02 | 2013 | FLASH CONDENSATE TO PRODUCE LOWER PRESSURE STEAM | $18,000 | $50,000 | Implemented |
TT0115 # 03 Y:2013 | 03 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $21,000 | $50,000 | Not Implemented |
TT0115 # 04 Y:2013 | 04 | 2013 | OPTIMIZE PLANT POWER FACTOR | $32,990 | $129,250 | Not Implemented |
TT0115 # 05 Y:2013 | 05 | 2013 | REPLACE ELECTRIC MOTORS WITH BACK PRESSURE STEAM TURBINES AND USE EXHAUST STEAM FOR PROCESS HEAT | $146,360 | $450,000 | Not Implemented |
TT0115 # 06 Y:2013 | 06 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,000 | $4,000 | Not Implemented |
TT0115 # 07 Y:2013 | 07 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,635 | $2,500 | Not Implemented |
TT0115 # 08 Y:2013 | 08 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,984 | $20,000 | Not Implemented |
TT0115 # 09 Y:2013 | 09 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,635 | $20,000 | Not Implemented |