IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,737

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0487 # 04 Y:2020 04 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,784 $10,912 Not Implemented
AS0487 # 05 Y:2020 05 2020 USE PHOTOCELL CONTROLS $12,092 $5,188 Not Implemented
CL2008 # 01 Y:2020 01 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,868 $0 Implemented
CL2008 # 02 Y:2020 02 2020 PREHEAT COMBUSTION AIR WITH WASTE HEAT $908 $4,500 Not Implemented
CL2008 # 03 Y:2020 03 2020 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,758 $2,616 Implemented
OK1027 # 01 Y:2020 01 2020 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $70,403 $206,750 Not Implemented
OK1027 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,303 $6,900 Not Implemented
OK1027 # 03 Y:2020 03 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,207 $7,407 Not Implemented
OK1027 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,521 $4,542 Implemented
OK1027 # 05 Y:2020 05 2020 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $48,801 $12,552 Not Implemented
TR0026 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,655 $3,928 Not Implemented
TR0026 # 02 Y:2020 02 2020 INSTALL OCCUPANCY SENSORS $108 $156 Not Implemented
TR0026 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $1,448 $30 Not Implemented
TR0026 # 04 Y:2020 04 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,284 $1,000 Not Implemented
TR0026 # 05 Y:2020 05 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $359 $1,000 Not Implemented
TR0026 # 06 Y:2020 06 2020 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $18,877 $5,000 Not Implemented
UA0225 # 01 Y:2020 01 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,563 $12,609 Implemented
UA0225 # 02 Y:2020 02 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,568 $8,775 Implemented
UA0225 # 03 Y:2020 03 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,691 $50 Implemented
UA0225 # 04 Y:2020 04 2020 MODIFY STARTUP/SHUTDOWN TIMES $12,578 $150 Not Implemented
UU0166 # 01 Y:2020 01 2020 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $18,960 $212,180 Implemented
UU0166 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,704 $52,483 Implemented
UU0166 # 03 Y:2020 03 2020 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,545 $1,200 Not Implemented
UU0166 # 04 Y:2020 04 2020 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,448 $1,660 Not Implemented
UU0166 # 05 Y:2020 05 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,409 $600 Implemented