IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,731

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0409 # 03 Y:2022 03 2022 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,003 $14,690 Implemented
MI0409 # 04 Y:2022 04 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,496 $240 Not Implemented
MI0409 # 05 Y:2022 05 2022 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,094 $1,885 Implemented
MI0409 # 06 Y:2022 06 2022 INSTALL OCCUPANCY SENSORS $235 $700 Implemented
MI0409 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $222 $363 Implemented
CO0744 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $26,159 $136,687 n/a
CO0744 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $881 $2,407 n/a
CO0744 # 03 Y:2022 03 2022 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,175 $7,076 n/a
CO0744 # 04 Y:2022 04 2022 INSTALL SPECTRAL REFLECTORS / DELAMP $1,847 $9,768 n/a
CO0744 # 05 Y:2022 05 2022 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $210,000 $58,000 n/a
CO0744 # 06 Y:2022 06 2022 CONSIDER POWER LOSS AS WELL AS INITIAL LOADS AND LOAD GROWTH IN DOWN-SIZING TRANSFORMERS $60,192 $4,219 n/a
CO0744 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,731 $3,276 n/a
UA0260 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,881 $1,000 Not Implemented
UA0260 # 02 Y:2022 02 2022 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $3,710 $1,651 Implemented
UA0260 # 03 Y:2022 03 2022 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $429,299 $2,825,211 Not Implemented
UA0260 # 04 Y:2022 04 2022 PREHEAT COMBUSTION AIR WITH WASTE HEAT $230,787 $328,350 Not Implemented
UA0260 # 05 Y:2022 05 2022 OPTIMIZE PLANT POWER FACTOR $90,617 $35,347 Implemented
UA0260 # 06 Y:2022 06 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,000 $1,784 Not Implemented
UF0582 # 01 Y:2022 01 2022 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $3,357,648 $12,825,000 Not Implemented
UF0582 # 02 Y:2022 02 2022 RECOVER WASTE HEAT FROM EQUIPMENT $1,189,637 $2,090,000 Not Implemented
UF0582 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $506,910 $647,662 Not Implemented
UF0582 # 04 Y:2022 04 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $226,296 $102,253 Implemented
UF0582 # 05 Y:2022 05 2022 USE FLUE GASES IN RADIANT HEATER FOR SPACE HEATING, OVENS, ETC $207,860 $705,580 Not Implemented
UF0582 # 06 Y:2022 06 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $37,793 $79,204 Implemented
UF0582 # 07 Y:2022 07 2022 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $32,856 $29,990 Not Implemented