Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,615
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0131 # 04 Y:1994 | 04 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,786 | $900 | Not Implemented |
ME0129 # 01 Y:1994 | 01 | 1994 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $5,142 | $5,400 | Not Implemented |
ME0129 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $770 | $900 | Not Implemented |
ME0129 # 03 Y:1994 | 03 | 1994 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,700 | $19,600 | Implemented |
ME0129 # 04 Y:1994 | 04 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,522 | $3,800 | Not Implemented |
ME0129 # 05 Y:1994 | 05 | 1994 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,617 | $880 | Implemented |
ME0128 # 01 Y:1994 | 01 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $2,591 | $2,250 | Implemented |
ME0128 # 02 Y:1994 | 02 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $887 | $100 | Not Implemented |
ME0128 # 03 Y:1994 | 03 | 1994 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $938 | $20 | Implemented |
ME0128 # 04 Y:1994 | 04 | 1994 | CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS | $1,845 | $1,120 | Implemented |
ME0128 # 05 Y:1994 | 05 | 1994 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $2,886 | $3,000 | Not Implemented |
ME0128 # 06 Y:1994 | 06 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $483 | $450 | Implemented |
ME0125 # 01 Y:1994 | 01 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $416 | $50 | Implemented |
ME0125 # 02 Y:1994 | 02 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,070 | $450 | Implemented |
ME0125 # 03 Y:1994 | 03 | 1994 | TURN OFF EQUIPMENT WHEN NOT IN USE | $763 | $0 | Implemented |
ME0125 # 04 Y:1994 | 04 | 1994 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $951 | $400 | Not Implemented |
ME0125 # 05 Y:1994 | 05 | 1994 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $634 | $500 | Implemented |
ME0125 # 06 Y:1994 | 06 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $990 | $960 | Implemented |
ME0126 # 01 Y:1994 | 01 | 1994 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $25,970 | $68,000 | Not Implemented |
ME0126 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $364 | $811 | Not Implemented |
ME0126 # 03 Y:1994 | 03 | 1994 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $11,087 | $6,000 | Not Implemented |
ME0126 # 04 Y:1994 | 04 | 1994 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $288 | $75 | Not Implemented |
ME0126 # 05 Y:1994 | 05 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,030 | $50 | Not Implemented |
ME0126 # 06 Y:1994 | 06 | 1994 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $58,800 | $120,000 | Not Implemented |
ME0126 # 07 Y:1994 | 07 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $13,080 | $15,000 | Not Implemented |