IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,568

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0460 # 04 Y:2004 04 2004 INSTALL EQUIPMENT TO MOVE PRODUCT $37,500 $14,200 Not Implemented
OR0460 # 05 Y:2004 05 2004 MOVE PRODUCT USING MECHANICAL MEANS $7,850 $2,320 Implemented
OR0459 # 01 Y:2004 01 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $4,500 $10,500 Not Implemented
OR0459 # 02 Y:2004 02 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $9,750 $300 Implemented
OR0459 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $4,820 $36,600 Implemented
OR0459 # 04 Y:2004 04 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $34,250 $2,000 Implemented
OR0459 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $5,330 $2,825 Implemented
OR0459 # 06 Y:2004 06 2004 OPTIMIZE PLANT POWER FACTOR $2,730 $5,130 Implemented
OR0457 # 01 Y:2004 01 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $24,600 $25,000 Implemented
OR0457 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,140 $10,000 Not Implemented
OR0457 # 03 Y:2004 03 2004 UPGRADE CONTROLS ON COMPRESSORS $31,300 $0 Implemented
OR0457 # 04 Y:2004 04 2004 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,100 $42,000 Not Implemented
OR0457 # 05 Y:2004 05 2004 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $18,900 $0 Implemented
OR0457 # 06 Y:2004 06 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,520 $300 Implemented
OR0456 # 01 Y:2004 01 2004 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $-1,300 $5,000 Not Implemented
OR0456 # 02 Y:2004 02 2004 KEEP BOILER TUBES CLEAN $37,240 $1,760 Not Implemented
OR0456 # 03 Y:2004 03 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $12,900 $2,410 Not Implemented
OR0456 # 04 Y:2004 04 2004 OPTIMIZE PLANT POWER FACTOR $4,900 $12,600 Not Implemented
OR0456 # 05 Y:2004 05 2004 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $11,550 $15,400 Implemented
OR0455 # 01 Y:2004 01 2004 RECOVER AND REUSE WASTE MATERIAL $45,100 $16,200 Implemented
OR0455 # 02 Y:2004 02 2004 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,570 $0 Implemented
OR0455 # 03 Y:2004 03 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,670 $6,670 Not Implemented
OR0455 # 04 Y:2004 04 2004 INSTALL OCCUPANCY SENSORS $2,140 $1,750 Implemented
OR0455 # 05 Y:2004 05 2004 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $1,420 $150 Implemented
OR0455 # 06 Y:2004 06 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $1,510 $790 Not Implemented