IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0766 # 04 Y:2018 04 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $3,100 $0 Not Implemented
AM0766 # 05 Y:2018 05 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,260 $0 Not Implemented
AM0766 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $3,460 Not Implemented
AM0765 # 01 Y:2018 01 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $173,300 $721,800 Not Implemented
AM0765 # 02 Y:2018 02 2018 OPTIMIZE PLANT POWER FACTOR $71,530 $81,610 Implemented
AM0765 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,060 $1,000 Implemented
AM0765 # 04 Y:2018 04 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,210 $22 Not Implemented
AM0765 # 05 Y:2018 05 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $2,740 $0 Implemented
AM0765 # 06 Y:2018 06 2018 INSTALL OCCUPANCY SENSORS $510 $595 Implemented
AM0764 # 01 Y:2018 01 2018 USE EVAPORATION TO CONCENTRATE MATERIAL $13,350 $7,000 Not Implemented
AM0764 # 02 Y:2018 02 2018 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $20,080 $7,000 Not Implemented
AM0764 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $3,725 $7,170 Not Implemented
AM0764 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,310 $1,000 Implemented
AM0764 # 05 Y:2018 05 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $820 $1,390 Not Implemented
AM0764 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $720 $8 Implemented
AM0764 # 07 Y:2018 07 2018 PAY UTILITY BILLS ON TIME $715 $0 Implemented
AM0764 # 08 Y:2018 08 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $8 Not Implemented
AM0764 # 09 Y:2018 09 2018 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $340 $130 Not Implemented
AM0763 # 01 Y:2018 01 2018 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $327,000 $0 Not Implemented
AM0763 # 02 Y:2018 02 2018 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $515,700 $2,200,000 Not Implemented
AM0763 # 03 Y:2018 03 2018 OPTIMIZE PLANT POWER FACTOR $105,400 $136,400 Implemented
AM0763 # 04 Y:2018 04 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $98,130 $20,000 Implemented
AM0763 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $45,525 $8,000 Not Implemented
AM0763 # 06 Y:2018 06 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $38,730 $42,230 Implemented
AM0763 # 07 Y:2018 07 2018 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $38,500 $400 Not Implemented