Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,500
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OD0139 # 04 Y:1999 | 04 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,555 | $2,000 | Not Implemented |
OD0138 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,813 | $45,982 | Not Implemented |
OD0138 # 02 Y:1999 | 02 | 1999 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $2,361 | $1,100 | Not Implemented |
OD0138 # 03 Y:1999 | 03 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $858 | $4,020 | Not Implemented |
OD0138 # 04 Y:1999 | 04 | 1999 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,382 | $400 | Not Implemented |
OD0138 # 05 Y:1999 | 05 | 1999 | SELL COMBUSTIBLE WASTE | $15,574 | $0 | Not Implemented |
OD0138 # 06 Y:1999 | 06 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $325 | $0 | Not Implemented |
OD0135 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $331 | $773 | Not Implemented |
OD0135 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $849 | $800 | Implemented |
OD0135 # 03 Y:1999 | 03 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $79 | $20 | Not Implemented |
OD0135 # 04 Y:1999 | 04 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $413 | $1,870 | Not Implemented |
OD0134 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,888 | $13,066 | Not Implemented |
OD0134 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,153 | $800 | Not Implemented |
OD0134 # 03 Y:1999 | 03 | 1999 | INSULATE BARE EQUIPMENT | $8,350 | $30,000 | Not Implemented |
OD0134 # 04 Y:1999 | 04 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $92,062 | $180,000 | Not Implemented |
OD0133 # 01 Y:1999 | 01 | 1999 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,321 | $2,500 | Implemented |
OD0133 # 02 Y:1999 | 02 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $33,448 | $99,497 | Not Implemented |
OD0133 # 03 Y:1999 | 03 | 1999 | OPTIMIZE PLANT POWER FACTOR | $7,094 | $11,100 | Not Implemented |
OD0132 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $713 | $50 | Not Implemented |
OD0132 # 02 Y:1999 | 02 | 1999 | INSTALL OCCUPANCY SENSORS | $702 | $190 | Not Implemented |
OD0132 # 03 Y:1999 | 03 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $7,459 | $0 | Not Implemented |
OD0132 # 04 Y:1999 | 04 | 1999 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $1,114 | $0 | Not Implemented |
OD0131 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $416 | $900 | Not Implemented |
OD0131 # 02 Y:1999 | 02 | 1999 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $4,051 | $3,290 | Not Implemented |
OD0131 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $10,972 | $800 | Not Implemented |