IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,996

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0095 # 05 Y:1997 05 1997 INSTALL OCCUPANCY SENSORS $1,553 $225 Implemented
BD0095 # 06 Y:1997 06 1997 USE SYNTHETIC LUBRICANT $1,349 $300 Not Implemented
BD0095 # 07 Y:1997 07 1997 REDUCE VENTILATION AIR $1,321 $1,000 Not Implemented
BD0095 # 08 Y:1997 08 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,319 $800 Not Implemented
BD0095 # 09 Y:1997 09 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $699 $1,201 Implemented
BD0095 # 10 Y:1997 10 1997 INSTALL TURBULATORS $281 $502 Not Implemented
BD0095 # 11 Y:1997 11 1997 CONTRACT A WOOD PALLET RECYCLING COMPANY $5,430 $420 Not Implemented
BD0095 # 12 Y:1997 12 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $750 $400 Not Implemented
BD0095 # 13 Y:1997 13 1997 $259,130 $240,900 Not Implemented
AR0124 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $757 $120 Implemented
AR0124 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,334 $586 Not Implemented
AR0124 # 03 Y:1997 03 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,547 $605 Not Implemented
AR0124 # 04 Y:1997 04 1997 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $2,617 $100 Implemented
AR0124 # 05 Y:1997 05 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $0 Implemented
AR0124 # 06 Y:1997 06 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $376 $100 Implemented
AR0124 # 07 Y:1997 07 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,103 $1,238 Implemented
AR0124 # 08 Y:1997 08 1997 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $950 $100 Implemented
AR0124 # 09 Y:1997 09 1997 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $3,514 $0 Not Implemented
AR0124 # 10 Y:1997 10 1997 $26,000 $2,500 Not Implemented
UD0528 # 01 Y:1997 01 1997 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $4,108 $0 Implemented
UD0528 # 02 Y:1997 02 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,857 $10,000 Implemented
UD0528 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,076 $5,818 Implemented
UD0528 # 04 Y:1997 04 1997 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $2,886 $200 Implemented
UD0528 # 05 Y:1997 05 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $2,859 $11,000 Not Implemented
UD0529 # 01 Y:1997 01 1997 $4,259 $0 Implemented