Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,295
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OK1048 # 05 Y:2021 | 05 | 2021 | OPTIMIZE PLANT POWER FACTOR | $22,294 | $15,000 | Not Implemented |
NC0662 # 01 Y:2021 | 01 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,757 | $2,000 | n/a |
NC0662 # 02 Y:2021 | 02 | 2021 | RECOVER WASTE HEAT FROM EQUIPMENT | $4,792 | $5,472 | n/a |
NC0662 # 03 Y:2021 | 03 | 2021 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $10,634 | $39,970 | n/a |
NC0662 # 04 Y:2021 | 04 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,566 | $3,150 | n/a |
NC0662 # 05 Y:2021 | 05 | 2021 | INSTALL OCCUPANCY SENSORS | $64 | $280 | n/a |
NC0662 # 06 Y:2021 | 06 | 2021 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $19,234 | $75,000 | n/a |
NC0662 # 07 Y:2021 | 07 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $78,648 | $250,000 | n/a |
LS2102 # 01 Y:2021 | 01 | 2021 | PAY UTILITY BILLS ON TIME | $902 | $25 | Implemented |
LS2102 # 02 Y:2021 | 02 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,529 | $270 | Implemented |
LS2102 # 03 Y:2021 | 03 | 2021 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $6,357 | $4,200 | Not Implemented |
LS2102 # 04 Y:2021 | 04 | 2021 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $51 | $141 | Not Implemented |
LS2102 # 05 Y:2021 | 05 | 2021 | INSTALL AUTOMATIC PACKING EQUIPMENT | $42,634 | $120,000 | Implemented |
LS2101 # 01 Y:2021 | 01 | 2021 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $167 | $25 | Not Implemented |
LS2101 # 02 Y:2021 | 02 | 2021 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $37,040 | $68,125 | Not Implemented |
LS2101 # 03 Y:2021 | 03 | 2021 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,907 | $26,500 | Not Implemented |
CL2108 # 01 Y:2021 | 01 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,199 | $12,730 | n/a |
CL2108 # 02 Y:2021 | 02 | 2021 | INSTALL OCCUPANCY SENSORS | $1,049 | $3,565 | n/a |
CL2108 # 03 Y:2021 | 03 | 2021 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,596 | $2,100 | n/a |
CL2108 # 04 Y:2021 | 04 | 2021 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $182 | $520 | n/a |
CL2108 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,061 | $10,000 | n/a |
CL2108 # 06 Y:2021 | 06 | 2021 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,453 | $0 | n/a |
CL2108 # 07 Y:2021 | 07 | 2021 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $947 | $0 | n/a |
CL2108 # 08 Y:2021 | 08 | 2021 | KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE | $166 | $0 | n/a |
TT0252 # 01 Y:2021 | 01 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $24,977 | $21,240 | Not Implemented |