IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

162,454

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
CO0192 # 01 Y:1990 01 1990 HEAT WATER WITH EXHAUST HEAT $9,236 $16,000 Not Implemented
CO0192 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,367 $1,042 Implemented
CO0192 # 03 Y:1990 03 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,400 $6,000 Implemented
CO0192 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $8,600 $2,000 Implemented
CO0192 # 05 Y:1990 05 1990 MAINTAIN STEAM JETS USED FOR VACUUM SYSTEM $4,700 $1,600 Implemented
CO0192 # 06 Y:1990 06 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,800 $6,000 Not Implemented
CO0192 # 07 Y:1990 07 1990 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,400 $5,000 Not Implemented
CO0192 # 08 Y:1990 08 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $100 $283 Implemented
UD0325 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $8,661 $5,500 Implemented
UD0325 # 02 Y:1990 02 1990 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,752 $11,000 Implemented
UD0325 # 03 Y:1990 03 1990 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $1,240 $300 Not Implemented
UD0325 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,774 $27,775 Not Implemented
UD0325 # 05 Y:1990 05 1990 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $32,480 $60,000 Not Implemented
UD0325 # 06 Y:1990 06 1990 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $7,978 $20,000 Implemented
UD0326 # 01 Y:1990 01 1990 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $2,550 $3,000 Not Implemented
UD0326 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,372 $0 Implemented
UD0326 # 03 Y:1990 03 1990 SHIFT FROM DAYTIME TO NIGHTTIME OPERATION $3,745 $0 Not Implemented
UD0327 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $14,606 $12,000 Implemented
UD0327 # 02 Y:1990 02 1990 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $49,772 $3,000 Implemented
UD0327 # 03 Y:1990 03 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $1,063 $1,000 Not Implemented
UD0327 # 04 Y:1990 04 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $-1,479 $540 Implemented
UD0327 # 05 Y:1990 05 1990 INSTALL TIMERS AND/OR THERMOSTATS $962 $600 Not Implemented
TN0408 # 01 Y:1990 01 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $52,799 $3,900 Implemented
TN0408 # 02 Y:1990 02 1990 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $446,132 $265,300 Not Implemented
TN0408 # 03 Y:1990 03 1990 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $52,799 $0 Implemented