IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158,721

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0046 # 09 Y:1989 09 1989 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $265 $150 Implemented
AM0046 # 10 Y:1989 10 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $58 $400 Implemented
OR0039 # 02 Y:1988 02 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $630 Implemented
OR0039 # 03 Y:1988 03 1988 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $73,000 $100,000 Not Implemented
OR0039 # 04 Y:1988 04 1988 OPTIMIZE PLANT POWER FACTOR $6,379 $13,650 Implemented
OR0039 # 05 Y:1988 05 1988 USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD $15,101 $32,576 Implemented
OR0040 # 01 Y:1988 01 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $3,046 $0 Implemented
OR0040 # 02 Y:1988 02 1988 INSULATE BARE EQUIPMENT $2,878 $858 Implemented
OR0040 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,704 $1,375 Not Implemented
OR0040 # 04 Y:1988 04 1988 INSULATE BARE EQUIPMENT $1,853 $1,546 Not Implemented
OR0040 # 05 Y:1988 05 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $125 $114 Implemented
OR0040 # 06 Y:1988 06 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,439 $4,800 Implemented
OR0040 # 07 Y:1988 07 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $696 $845 Not Implemented
OR0040 # 08 Y:1988 08 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $891 $1,213 Implemented
OR0040 # 09 Y:1988 09 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $19,381 $29,735 Not Implemented
OR0040 # 10 Y:1988 10 1988 OPTIMIZE PLANT POWER FACTOR $1,606 $3,600 Not Implemented
OR0034 # 01 Y:1988 01 1988 SHUT OFF STEAM TRAPS ON SUPER HEATED STEAM LINES WHEN NOT IN USE $975 $44 Implemented
OR0034 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,437 $835 Not Implemented
OR0034 # 03 Y:1988 03 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $1,802 $1,200 Implemented
OR0034 # 04 Y:1988 04 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $227 $300 Implemented
OR0034 # 05 Y:1988 05 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52 $137 Implemented
OR0034 # 06 Y:1988 06 1988 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $872 $3,420 Implemented
OR0037 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,463 $0 Not Implemented
OR0037 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,466 $300 Not Implemented
OR0037 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,754 $500 Implemented