Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,767
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0083 # 02 Y:2011 | 02 | 2011 | INSTALL SKYLIGHTS | $2,883 | $36,500 | Not Implemented |
TT0083 # 03 Y:2011 | 03 | 2011 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $14,378 | $1,200 | Implemented |
TT0083 # 04 Y:2011 | 04 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $337 | $29,076 | Not Implemented |
TT0083 # 05 Y:2011 | 05 | 2011 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $267 | $1,370 | Not Implemented |
TT0083 # 06 Y:2011 | 06 | 2011 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $5,312 | $3,825 | Not Implemented |
TT0079 # 01 Y:2011 | 01 | 2011 | DISCONNECT BALLASTS | $508 | $0 | Implemented |
TT0079 # 02 Y:2011 | 02 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $336 | $0 | Implemented |
TT0079 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $205 | $0 | Implemented |
TT0079 # 04 Y:2011 | 04 | 2011 | INSTALL OCCUPANCY SENSORS | $1,618 | $0 | Not Implemented |
TT0079 # 05 Y:2011 | 05 | 2011 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $631 | $0 | Not Implemented |
TT0079 # 06 Y:2011 | 06 | 2011 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $1,937 | $0 | Implemented |
TT0079 # 07 Y:2011 | 07 | 2011 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,691 | $0 | Not Implemented |
TT0079 # 08 Y:2011 | 08 | 2011 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,584 | $0 | Not Implemented |
TT0076 # 01 Y:2011 | 01 | 2011 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $7,311 | $0 | Implemented |
TT0076 # 02 Y:2011 | 02 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,661 | $5,000 | Implemented |
TT0076 # 03 Y:2011 | 03 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,735 | $1,654 | Not Implemented |
TT0076 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,371 | $4,540 | Not Implemented |
TT0076 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,101 | $13,238 | Not Implemented |
TT0081 # 01 Y:2011 | 01 | 2011 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $89,000 | $24,500 | Not Implemented |
TT0081 # 02 Y:2011 | 02 | 2011 | USE STEAM PRESSURE REDUCTION TO GENERATE POWER | $204,112 | $553,850 | Not Implemented |
TT0081 # 03 Y:2011 | 03 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,218 | $44,000 | Not Implemented |
TT0081 # 04 Y:2011 | 04 | 2011 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,662 | $5 | Not Implemented |
TT0081 # 05 Y:2011 | 05 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $58,700 | $103,900 | Implemented |
TT0081 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $34,694 | $70,320 | Implemented |
TT0081 # 07 Y:2011 | 07 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,492 | $8,160 | Implemented |