Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TA0012 # 03 Y:2001 | 03 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $4,500 | $9,450 | Not Implemented |
TA0012 # 04 Y:2001 | 04 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,300 | $300 | Implemented |
TA0012 # 05 Y:2001 | 05 | 2001 | INSTALL OCCUPANCY SENSORS | $920 | $130 | Not Implemented |
TA0012 # 06 Y:2001 | 06 | 2001 | INSTALL OCCUPANCY SENSORS | $770 | $260 | Implemented |
WV0223 # 01 Y:2001 | 01 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,194 | $1,000 | Not Implemented |
WV0223 # 02 Y:2001 | 02 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,692 | $300 | Implemented |
WV0223 # 03 Y:2001 | 03 | 2001 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $3,270 | $124 | Implemented |
WV0223 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,630 | $386 | Not Implemented |
WV0223 # 05 Y:2001 | 05 | 2001 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $7,635 | $1,344 | Implemented |
WV0223 # 06 Y:2001 | 06 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,567 | $44 | Implemented |
WV0223 # 07 Y:2001 | 07 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $13,680 | $220 | Implemented |
WV0223 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $92,576 | $12,000 | Not Implemented |
WV0223 # 09 Y:2001 | 09 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $216,000 | $400,000 | Not Implemented |
UD0631 # 01 Y:2001 | 01 | 2001 | INSTALL EQUIPMENT TO MOVE PRODUCT | $324,000 | $1,600,000 | Implemented |
UD0631 # 02 Y:2001 | 02 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $708,750 | $350,000 | Implemented |
UD0631 # 03 Y:2001 | 03 | 2001 | DEVELOP STANDARD OPERATING PROCEDURES | $162,000 | $48,000 | Implemented |
UD0631 # 04 Y:2001 | 04 | 2001 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $19,834 | $12,680 | Not Implemented |
UD0631 # 05 Y:2001 | 05 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $6,067 | $7,000 | Not Implemented |
UD0631 # 06 Y:2001 | 06 | 2001 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $9,670 | $3,680 | Implemented |
UD0631 # 07 Y:2001 | 07 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,361 | $588 | Not Implemented |
UD0631 # 08 Y:2001 | 08 | 2001 | USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE | $2,800 | $960 | Implemented |
UD0631 # 09 Y:2001 | 09 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,671 | $0 | Implemented |
UD0631 # 10 Y:2001 | 10 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $904 | $0 | Not Implemented |
UD0631 # 11 Y:2001 | 11 | 2001 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $797 | $1,168 | Not Implemented |
UD0631 # 12 Y:2001 | 12 | 2001 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $534 | $680 | Not Implemented |