IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TA0012 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,500 $9,450 Not Implemented
TA0012 # 04 Y:2001 04 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,300 $300 Implemented
TA0012 # 05 Y:2001 05 2001 INSTALL OCCUPANCY SENSORS $920 $130 Not Implemented
TA0012 # 06 Y:2001 06 2001 INSTALL OCCUPANCY SENSORS $770 $260 Implemented
WV0223 # 01 Y:2001 01 2001 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,194 $1,000 Not Implemented
WV0223 # 02 Y:2001 02 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,692 $300 Implemented
WV0223 # 03 Y:2001 03 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,270 $124 Implemented
WV0223 # 04 Y:2001 04 2001 RECOVER WASTE HEAT FROM EQUIPMENT $6,630 $386 Not Implemented
WV0223 # 05 Y:2001 05 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $7,635 $1,344 Implemented
WV0223 # 06 Y:2001 06 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,567 $44 Implemented
WV0223 # 07 Y:2001 07 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $13,680 $220 Implemented
WV0223 # 08 Y:2001 08 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $92,576 $12,000 Not Implemented
WV0223 # 09 Y:2001 09 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $216,000 $400,000 Not Implemented
UD0631 # 01 Y:2001 01 2001 INSTALL EQUIPMENT TO MOVE PRODUCT $324,000 $1,600,000 Implemented
UD0631 # 02 Y:2001 02 2001 DEVELOP STANDARD OPERATING PROCEDURES $708,750 $350,000 Implemented
UD0631 # 03 Y:2001 03 2001 DEVELOP STANDARD OPERATING PROCEDURES $162,000 $48,000 Implemented
UD0631 # 04 Y:2001 04 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $19,834 $12,680 Not Implemented
UD0631 # 05 Y:2001 05 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $6,067 $7,000 Not Implemented
UD0631 # 06 Y:2001 06 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $9,670 $3,680 Implemented
UD0631 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,361 $588 Not Implemented
UD0631 # 08 Y:2001 08 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,800 $960 Implemented
UD0631 # 09 Y:2001 09 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,671 $0 Implemented
UD0631 # 10 Y:2001 10 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $904 $0 Not Implemented
UD0631 # 11 Y:2001 11 2001 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $797 $1,168 Not Implemented
UD0631 # 12 Y:2001 12 2001 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $534 $680 Not Implemented