Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0305 # 10 Y:2006 | 10 | 2006 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $527 | $2,145 | Not Implemented |
UM0305 # 11 Y:2006 | 11 | 2006 | RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR | $160 | $200 | Not Implemented |
UD0742 # 01 Y:2006 | 01 | 2006 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $314,266 | $2,000,000 | Not Implemented |
UD0742 # 02 Y:2006 | 02 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $198,228 | $100,000 | Implemented |
UD0742 # 03 Y:2006 | 03 | 2006 | USE ONLY AMOUNT OF AIR NECESSARY TO PREVENT EXPLOSION HAZARD | $185,439 | $0 | Not Implemented |
UD0742 # 04 Y:2006 | 04 | 2006 | REDESIGN PROCESS | $174,377 | $0 | Implemented |
UD0742 # 05 Y:2006 | 05 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $157,269 | $50,000 | Not Implemented |
UD0742 # 06 Y:2006 | 06 | 2006 | USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS | $141,723 | $50,000 | Not Implemented |
UD0742 # 07 Y:2006 | 07 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $67,853 | $0 | Not Implemented |
UD0742 # 08 Y:2006 | 08 | 2006 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $67,500 | $39,000 | Not Implemented |
UD0742 # 09 Y:2006 | 09 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $55,855 | $10,000 | Implemented |
UD0742 # 10 Y:2006 | 10 | 2006 | USE OPTIMUM THICKNESS INSULATION | $42,660 | $15,558 | Not Implemented |
UD0742 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,660 | $122,500 | Implemented |
UD0742 # 12 Y:2006 | 12 | 2006 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $19,230 | $0 | Implemented |
UD0742 # 13 Y:2006 | 13 | 2006 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,813 | $51,160 | Not Implemented |
UD0742 # 14 Y:2006 | 14 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $17,949 | $0 | Implemented |
UD0742 # 15 Y:2006 | 15 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $9,232 | $5,000 | Not Implemented |
UD0742 # 16 Y:2006 | 16 | 2006 | REDUCE WATER USE WITH COUNTER CURRENT RINSING | $7,083 | $0 | Implemented |
UD0742 # 17 Y:2006 | 17 | 2006 | USE OPTIMUM THICKNESS INSULATION | $4,031 | $9,057 | Not Implemented |
UD0742 # 18 Y:2006 | 18 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,020 | $0 | Implemented |
UD0742 # 19 Y:2006 | 19 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $874 | $867 | Implemented |
SU0239 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $13,600 | $0 | Implemented |
SU0239 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,502 | $0 | Not Implemented |
SU0239 # 03 Y:2006 | 03 | 2006 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,365 | $0 | Implemented |
SU0239 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,985 | $440 | Implemented |