IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

160,834

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0029 # 01 Y:1988 01 1988 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,789 $5,000 Implemented
OR0029 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $914 $0 Implemented
OR0029 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,939 $600 Implemented
OR0029 # 04 Y:1988 04 1988 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $119 $177 Implemented
OR0029 # 05 Y:1988 05 1988 INCREASE AMOUNT OF CONDENSATE RETURNED $1,774 $712 Implemented
OR0029 # 06 Y:1988 06 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24 $51 Implemented
RU0029 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $834 $322 Implemented
RU0029 # 02 Y:1988 02 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $654 $202 Implemented
RU0029 # 03 Y:1988 03 1988 INSTALL SET-BACK TIMERS $1,898 $0 Not Implemented
RU0029 # 04 Y:1988 04 1988 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,940 $0 Implemented
RU0029 # 05 Y:1988 05 1988 KEEP DOORS AND WINDOWS SHUT WHEN NOT ON USE $933 $0 Implemented
RU0030 # 01 Y:1988 01 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $706 $0 Not Implemented
RU0030 # 02 Y:1988 02 1988 IMPROVE LUBRICATION PRACTICES $1,333 $1,200 Implemented
RU0030 # 03 Y:1988 03 1988 INSULATE BARE EQUIPMENT $2,980 $167 Not Implemented
RU0030 # 04 Y:1988 04 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $20,724 $17,000 Not Implemented
MA0122 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,227 $261 Not Implemented
MA0122 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $3,093 $6,500 Not Implemented
MA0122 # 03 Y:1988 03 1988 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,193 $300 Not Implemented
MA0122 # 04 Y:1988 04 1988 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $17,916 $10,000 Implemented
MA0122 # 05 Y:1988 05 1988 INSTALL TIMERS AND/OR THERMOSTATS $5,883 $3,400 Implemented
LT0121 # 01 Y:1988 01 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $22,200 $7,900 Not Implemented
LT0121 # 02 Y:1988 02 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,200 $0 Not Implemented
LT0121 # 03 Y:1988 03 1988 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $472 $268 Not Implemented
LT0121 # 04 Y:1988 04 1988 INSTALL TIMERS AND/OR THERMOSTATS $553 $150 Not Implemented
LT0123 # 01 Y:1988 01 1988 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $10,023 $14,000 Not Implemented