IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UL2314 # 01 Y:2023 01 2023 OPTIMIZE PLANT POWER FACTOR $29,804 $13,936 Not Implemented
UL2314 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,821 $13,461 Not Implemented
UL2314 # 03 Y:2023 03 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $20,576 $15,000 Not Implemented
UL2314 # 04 Y:2023 04 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,358 $0 Not Implemented
UL2314 # 05 Y:2023 05 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,061 $4,320 Implemented
UL2314 # 06 Y:2023 06 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,398 $6,825 Not Implemented
UL2314 # 07 Y:2023 07 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $54,095 $476,338 Not Implemented
UL2314 # 08 Y:2023 08 2023 USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER $2,765 $100 Implemented
UL2314 # 09 Y:2023 09 2023 RECOVER WASTE HEAT FROM EQUIPMENT $5,470 $15,600 Not Implemented
UL2313 # 06 Y:2023 06 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $6,989 $15,000 Not Implemented
UL2313 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,411 $30,977 Not Implemented
UL2313 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,325 $2,880 Not Implemented
UL2313 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,566 $0 Not Implemented
UL2313 # 04 Y:2023 04 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,515 $14,625 Not Implemented
UL2313 # 05 Y:2023 05 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $95,755 $917,406 Not Implemented
UL2312 # 01 Y:2023 01 2023 INSTALL SPECTRAL REFLECTORS / DELAMP $5,925 $0 Implemented
UL2312 # 02 Y:2023 02 2023 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,419 $15,000 Implemented
UL2312 # 03 Y:2023 03 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $450 $0 Implemented
UL2312 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,248 $1,620 Implemented
UL2312 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $167 $488 Not Implemented
UL2312 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $18,666 $224,516 Not Implemented
UL2312 # 07 Y:2023 07 2023 SHADE WINDOWS FROM SUMMER SUN $7,159 $34,500 Not Implemented
UL2311 # 01 Y:2023 01 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,819 $13,218 Implemented
UL2311 # 02 Y:2023 02 2023 INSTALL OCCUPANCY SENSORS $2,078 $2,711 Not Implemented
UL2311 # 03 Y:2023 03 2023 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,286 $1,600 Implemented