IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,152

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0151 # 04 Y:1982 04 1982 REDUCE FLUID FLOW RATES $6,797 $5,000 Not Implemented
GT0151 # 03 Y:1982 03 1982 KEEP BOILER TUBES CLEAN $20,627 $500 Implemented
GT0151 # 02 Y:1982 02 1982 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $42,062 $0 Implemented
GT0151 # 01 Y:1982 01 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $14,476 $20,520 Not Implemented
GT0149 # 05 Y:1982 05 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,503 $5,997 Not Implemented
GT0149 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,725 $75 Not Implemented
GT0149 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $608 $904 Not Implemented
GT0149 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $345 $840 Not Implemented
GT0145 # 06 Y:1982 06 1982 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,293 $9,000 Not Implemented
GT0145 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,787 $1,500 Not Implemented
GT0145 # 04 Y:1982 04 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,955 $50 Not Implemented
GT0145 # 03 Y:1982 03 1982 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,822 $72,246 Not Implemented
GT0145 # 02 Y:1982 02 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,373 $0 Not Implemented
GT0145 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,467 $10,573 Not Implemented
GT0149 # 01 Y:1982 01 1982 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $81 $110 Not Implemented
UD0058 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,729 $2,704 Implemented
UD0058 # 02 Y:1982 02 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $3,048 $131,000 Not Implemented
UD0058 # 03 Y:1982 03 1982 INSTALL STORM WINDOWS AND DOORS $7,704 $143,000 Not Implemented
UD0058 # 04 Y:1982 04 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,600 $4,500 Implemented
UD0060 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,603 $4,366 Implemented
UD0060 # 02 Y:1982 02 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,089 $1,000 Implemented
UD0060 # 03 Y:1982 03 1982 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $9,604 $139,500 Not Implemented
UD0060 # 04 Y:1982 04 1982 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $28,230 $46,000 Implemented
UD0060 # 05 Y:1982 05 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $618 $0 Implemented
UD0061 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,961 $9,877 Not Implemented