IAC logo
IAC Assessment: GT0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1982
Principal Product SYNTHETIC COTTON BLENDS
NAICS n/a
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 385
Plant Area (Sq.Ft.) 0
Annual Production 216,000 Thousand Feet
Production Hrs. Annual 7,120
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $521,863 12,932,005 kWh $0.04
Natural Gas $92,936 22,641 MMBtu $4.10
Fuel Oil #2 $8,221 1,058 MMBtu $7.77
TOTAL ENERGY COSTS $623,020
RECOMMENDED SAVINGS* $55,697 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2
$ kWh $ MMBtu $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,467
Cost:
$10,573
$7,467 184,936 - - - - $7,467
184,936
kWh
-
-
MMBtu
-
-
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$6,373
Cost:
-
- - $5,857 1,426 $516 67 -
-
kWh
$5,857
1,426
MMBtu
$516
67
MMBtu
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$17,822
Cost:
$72,246
$17,822 441,383 - - - - $17,822
441,383
kWh
-
-
MMBtu
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,955
Cost:
$50
$4,955 122,802 - - - - $4,955
122,802
kWh
-
-
MMBtu
-
-
MMBtu
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,787
Cost:
$1,500
$2,787 69,168 - - - - $2,787
69,168
kWh
-
-
MMBtu
-
-
MMBtu
06: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$16,293
Cost:
$9,000
$16,293 - - - - - $16,293
-
kWh
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$55,697
Cost:
$93,369
$49,324 818,289 $5,857 1,426 $516 67 $49,324
818,289
kWh
$5,857
1,426
MMBtu
$516
67
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu
Electricity Usage Natural Gas Fuel Oil #2 Electricity Usage Natural Gas Fuel Oil #2