Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,998
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0297 # 03 Y:1986 | 03 | 1986 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $23,107 | $20,800 | Implemented |
TN0297 # 02 Y:1986 | 02 | 1986 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $42,615 | $46,000 | Implemented |
TN0297 # 01 Y:1986 | 01 | 1986 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $80,968 | $70,000 | Not Implemented |
CO0079 # 08 Y:1986 | 08 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,816 | $1,000 | Implemented |
CO0079 # 07 Y:1986 | 07 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $25,097 | $3,098 | Implemented |
CO0079 # 06 Y:1986 | 06 | 1986 | INSTALL TIMERS AND/OR THERMOSTATS | $3,423 | $46 | Implemented |
CO0079 # 05 Y:1986 | 05 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $13,012 | $12,000 | Implemented |
CO0079 # 04 Y:1986 | 04 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $26,207 | $7,000 | Implemented |
CO0079 # 03 Y:1986 | 03 | 1986 | INSULATE BARE EQUIPMENT | $43,492 | $37,500 | Not Implemented |
CO0079 # 02 Y:1986 | 02 | 1986 | IMPROVE LUBRICATION PRACTICES | $56,931 | $0 | Implemented |
CO0079 # 01 Y:1986 | 01 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $1,207,312 | $5,000,000 | Not Implemented |
CO0078 # 07 Y:1986 | 07 | 1986 | REDESIGN PROCESS | $112,427 | $120,000 | Not Implemented |
CO0078 # 06 Y:1986 | 06 | 1986 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,730 | $1,000 | Not Implemented |
CO0078 # 05 Y:1986 | 05 | 1986 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $4,242 | $300 | Implemented |
CO0078 # 04 Y:1986 | 04 | 1986 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,746 | $3,000 | Implemented |
CO0078 # 03 Y:1986 | 03 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $19,055 | $1,000 | Implemented |
CO0078 # 02 Y:1986 | 02 | 1986 | OPTIMIZE PLANT POWER FACTOR | $6,480 | $2,459 | Implemented |
CO0078 # 01 Y:1986 | 01 | 1986 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $20,490 | $100,000 | Not Implemented |
CO0077 # 12 Y:1986 | 12 | 1986 | TURN OFF EQUIPMENT WHEN NOT IN USE | $179 | $0 | Implemented |
CO0077 # 11 Y:1986 | 11 | 1986 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $175 | $341 | Implemented |
CO0077 # 10 Y:1986 | 10 | 1986 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $447 | $300 | Implemented |
CO0077 # 09 Y:1986 | 09 | 1986 | INSULATE BARE EQUIPMENT | $479 | $408 | Not Implemented |
CO0077 # 08 Y:1986 | 08 | 1986 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $486 | $50 | Implemented |
CO0077 # 07 Y:1986 | 07 | 1986 | INSULATE BARE EQUIPMENT | $781 | $578 | Implemented |
CO0077 # 06 Y:1986 | 06 | 1986 | REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS | $1,116 | $400 | Implemented |