IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,998

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0293 # 01 Y:1986 01 1986 INSULATE BARE EQUIPMENT $13,716 $2,811 Implemented
TN0293 # 02 Y:1986 02 1986 USE OPTIMUM THICKNESS INSULATION $1,969 $500 Not Implemented
TN0293 # 03 Y:1986 03 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,536 $0 Not Implemented
MA0077 # 06 Y:1986 06 1986 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $580 $40 Not Implemented
MA0077 # 07 Y:1986 07 1986 REDUCE TEMPERATURE OF PROCESS EQUIPMENT WHEN ON STANDBY $1,650 $907 Not Implemented
MA0077 # 08 Y:1986 08 1986 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $5,082 $0 Not Implemented
MA0077 # 05 Y:1986 05 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $17,850 $22,500 Not Implemented
KU0211 # 06 Y:1986 06 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,890 $5,585 Implemented
MA0077 # 04 Y:1986 04 1986 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $11,705 $7,200 Not Implemented
MA0077 # 03 Y:1986 03 1986 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,888 $4,650 Not Implemented
MA0077 # 02 Y:1986 02 1986 INSTALL / REPAIR INSULATION ON STEAM LINES $370 $753 Not Implemented
MA0077 # 01 Y:1986 01 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $659 $212 Not Implemented
LT0069 # 06 Y:1986 06 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,930 $2,160 Not Implemented
LT0069 # 05 Y:1986 05 1986 INSTALL SET-BACK TIMERS $196 $80 Not Implemented
LT0069 # 04 Y:1986 04 1986 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $899 $150 Implemented
LT0069 # 03 Y:1986 03 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,540 $3,300 Implemented
LT0069 # 02 Y:1986 02 1986 AIR CONDITION ONLY SPACE NECESSARY $590 $0 Implemented
LT0069 # 01 Y:1986 01 1986 INSTALL TIMERS AND/OR THERMOSTATS $1,700 $1,350 Implemented
LT0052 # 07 Y:1986 07 1986 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $556 $1,470 Not Implemented
LT0052 # 06 Y:1986 06 1986 INSTALL SET-BACK TIMERS $1,865 $0 Implemented
LT0052 # 05 Y:1986 05 1986 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $735 $770 Not Implemented
LT0052 # 04 Y:1986 04 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,659 $1,632 Implemented
LT0052 # 03 Y:1986 03 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,795 $4,990 Implemented
LT0052 # 02 Y:1986 02 1986 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,370 $1,220 Not Implemented
KU0211 # 05 Y:1986 05 1986 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,125 $6,000 Implemented