Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,520
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
ME0279 # 07 Y:1999 | 07 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $201 | $89 | Implemented |
ME0279 # 06 Y:1999 | 06 | 1999 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $493 | $1,754 | Not Implemented |
ME0279 # 05 Y:1999 | 05 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,720 | $6,216 | Implemented |
ME0279 # 04 Y:1999 | 04 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,824 | $900 | Not Implemented |
ME0279 # 03 Y:1999 | 03 | 1999 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $12,800 | $0 | Implemented |
ME0279 # 02 Y:1999 | 02 | 1999 | INSULATE BARE EQUIPMENT | $36,509 | $13,360 | Implemented |
ME0279 # 01 Y:1999 | 01 | 1999 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,257,001 | $332,109 | Not Implemented |
UF0237 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,848 | $2,526 | Not Implemented |
UF0237 # 02 Y:1999 | 02 | 1999 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $20,280 | $81,187 | Not Implemented |
UF0237 # 03 Y:1999 | 03 | 1999 | REDESIGN PROCESS | $418,000 | $141,700 | Not Implemented |
UF0237 # 04 Y:1999 | 04 | 1999 | ADOPT IN-HOUSE MATERIAL GENERATION | $1,357,000 | $6,200,000 | Not Implemented |
UL0230 # 09 Y:1999 | 09 | 1999 | INSTALL SHELVES / RACKS TO UTILIZE UNUSED SPACE | $1,308 | $2,270 | Not Implemented |
UL0230 # 08 Y:1999 | 08 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $2,893 | $2,120 | Implemented |
UL0230 # 07 Y:1999 | 07 | 1999 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $1,500 | $0 | Implemented |
UL0230 # 06 Y:1999 | 06 | 1999 | ELIMINATE OLD STOCK AND MODIFY INVENTORY CONTROL | $83,800 | $80,000 | Implemented |
UL0230 # 05 Y:1999 | 05 | 1999 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $297,462 | $167,000 | Not Implemented |
UL0230 # 04 Y:1999 | 04 | 1999 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $1,447 | $0 | Not Implemented |
UL0230 # 03 Y:1999 | 03 | 1999 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $2,860 | $0 | Not Implemented |
UL0230 # 02 Y:1999 | 02 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,353 | $500 | Implemented |
UL0230 # 01 Y:1999 | 01 | 1999 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,394 | $40 | Implemented |
MS0150 # 09 Y:1999 | 09 | 1999 | PAY BILLS ON TIME TO AVOID LATE FEES | $176 | $25 | Implemented |
MS0150 # 08 Y:1999 | 08 | 1999 | USE RE-USABLE FILTERS | $348 | $888 | Not Implemented |
MS0150 # 07 Y:1999 | 07 | 1999 | LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER | $1,137 | $0 | Implemented |
MS0150 # 06 Y:1999 | 06 | 1999 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $21,973 | $0 | Not Implemented |
MS0150 # 05 Y:1999 | 05 | 1999 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $1,004 | $43 | Implemented |