IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,394

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0475 # 05 Y:2004 05 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,100 $300 Implemented
AM0475 # 06 Y:2004 06 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,020 $33 Implemented
AM0475 # 07 Y:2004 07 2004 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,290 $400 Not Implemented
AM0475 # 08 Y:2004 08 2004 INSTALL / REPAIR INSULATION ON STEAM LINES $3,490 $900 Implemented
AM0475 # 09 Y:2004 09 2004 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,600 $12,500 Not Implemented
AM0475 # 10 Y:2004 10 2004 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,740 $425 Implemented
AM0475 # 11 Y:2004 11 2004 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $572 $699 Not Implemented
AM0475 # 12 Y:2004 12 2004 INSULATE BARE EQUIPMENT $450 $60 Not Implemented
GT0794 # 01 Y:2004 01 2004 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,414 $30,000 n/a
GT0794 # 02 Y:2004 02 2004 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,785 $3,525 Not Implemented
GT0794 # 03 Y:2004 03 2004 INSTALL OCCUPANCY SENSORS $595 $765 Not Implemented
GT0794 # 04 Y:2004 04 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,306 $2,046 Implemented
GT0794 # 05 Y:2004 05 2004 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $5,022 $3,380 Not Implemented
GT0794 # 06 Y:2004 06 2004 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,490 $2,500 Implemented
GT0794 # 07 Y:2004 07 2004 INSTALL TIMERS AND/OR THERMOSTATS $729 $1,500 Not Implemented
GT0794 # 08 Y:2004 08 2004 RECOVER WASTE HEAT FROM EQUIPMENT $8,773 $4,900 Not Implemented
GT0794 # 09 Y:2004 09 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,609 $0 Implemented
GT0795 # 01 Y:2004 01 2004 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $43,709 $0 Not Implemented
GT0795 # 02 Y:2004 02 2004 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $42,201 $34,000 Not Implemented
GT0795 # 03 Y:2004 03 2004 USE SYNTHETIC LUBRICANT $30,353 $0 Not Implemented
GT0795 # 04 Y:2004 04 2004 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $12,828 $48,861 Not Implemented
GT0795 # 05 Y:2004 05 2004 METER WASTE WATER $7,272 $0 Not Implemented
GT0795 # 06 Y:2004 06 2004 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,890 $836 Not Implemented
GT0795 # 07 Y:2004 07 2004 REPAIR AND ELIMINATE STEAM LEAKS $5,380 $4,000 Not Implemented
GT0795 # 08 Y:2004 08 2004 DISCONNECT BALLASTS $1,696 $3,640 Not Implemented