IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

7,713

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0336 # 05 Y:2018 05 2018 UTILIZE A LESS EXPENSIVE COOLING METHOD $4,515 $626 Not Implemented
MI0336 # 06 Y:2018 06 2018 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $3,709 $2,800 Implemented
MI0336 # 07 Y:2018 07 2018 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $2,620 $3,230 Not Implemented
MI0336 # 08 Y:2018 08 2018 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,516 $661 Not Implemented
MI0336 # 09 Y:2018 09 2018 INSTALL OCCUPANCY SENSORS $492 $1,466 Implemented
GT0915 # 01 Y:2018 01 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,293 $100 Implemented
GT0915 # 02 Y:2018 02 2018 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $3,909 $580 Implemented
GT0915 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,057 $13,064 Implemented
GT0915 # 04 Y:2018 04 2018 USE SOLAR HEAT TO MAKE ELECTRICTY $36,802 $531,855 Not Implemented
MI0335 # 01 Y:2018 01 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $4,545 $3,280 Implemented
MI0335 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,167 $8,063 Implemented
MI0335 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,894 $2,030 Implemented
MI0335 # 04 Y:2018 04 2018 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,798 $7,385 Implemented
MI0335 # 05 Y:2018 05 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,932 $7,536 Implemented
MI0335 # 06 Y:2018 06 2018 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $1,505 $480 Implemented
MI0335 # 07 Y:2018 07 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,235 $2,520 Implemented
MI0335 # 08 Y:2018 08 2018 RECOVER WASTE HEAT FROM EQUIPMENT $1,157 $5,370 Implemented
MI0334 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,234 $12,519 Not Implemented
MI0334 # 02 Y:2018 02 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,575 $13,838 Implemented
MI0334 # 03 Y:2018 03 2018 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,178 $2,030 Implemented
MI0334 # 04 Y:2018 04 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,175 $6,578 Not Implemented
MI0334 # 05 Y:2018 05 2018 TURN OFF EQUIPMENT WHEN NOT IN USE $1,877 $1,300 Implemented
MI0334 # 06 Y:2018 06 2018 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $1,637 $3,750 Not Implemented
MI0334 # 07 Y:2018 07 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,564 $3,102 Implemented
MI0334 # 08 Y:2018 08 2018 REDUCE DELIVERY SCHEDULES $1,454 $2,490 Implemented