IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UK1213 # 07 Y:2012 07 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $343 $269 Implemented
UK1213 # 08 Y:2012 08 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $654 $337 Implemented
UK1213 # 09 Y:2012 09 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $316 $327 Not Implemented
UK1213 # 10 Y:2012 10 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $49,180 $6,650 Not Implemented
UK1213 # 11 Y:2012 11 2012 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $3,482 $988 Not Implemented
UK1213 # 12 Y:2012 12 2012 RECOVER WASTE HEAT FROM EQUIPMENT $1,563 $4,550 Implemented
UK1212 # 01 Y:2012 01 2012 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $15,105 $14,500 Not Implemented
UK1212 # 02 Y:2012 02 2012 UPGRADE CONTROLS ON COMPRESSORS $14,492 $15,000 Not Implemented
UK1212 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,414 $26,320 Implemented
UK1212 # 04 Y:2012 04 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,314 $2,240 Implemented
UK1212 # 05 Y:2012 05 2012 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $4,209 $3,430 Implemented
UK1212 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,607 $400 Not Implemented
UK1212 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,205 $4,270 Not Implemented
UK1212 # 08 Y:2012 08 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $609 $990 Not Implemented
UK1212 # 09 Y:2012 09 2012 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $17,314 $0 Not Implemented
UK1212 # 10 Y:2012 10 2012 OPTIMIZE PLANT POWER FACTOR $4,850 $7,500 Not Implemented
UK1212 # 11 Y:2012 11 2012 PAY UTILITY BILLS ON TIME $1,535 $0 Implemented
UK1211 # 01 Y:2012 01 2012 UPGRADE CONTROLS ON COMPRESSORS $12,859 $11,250 Not Implemented
UK1211 # 02 Y:2012 02 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $940 $420 Not Implemented
UK1211 # 03 Y:2012 03 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,299 $7,500 Not Implemented
UK1211 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,517 $30,800 Not Implemented
UK1211 # 05 Y:2012 05 2012 INSULATE BARE EQUIPMENT $10,493 $5,984 Not Implemented
UK1211 # 06 Y:2012 06 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $14,200 $39,850 Not Implemented
UK1210 # 01 Y:2012 01 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,568 $12,500 Not Implemented
UK1210 # 02 Y:2012 02 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,955 $5,000 Not Implemented