IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0777 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,889 $19,448 Not Implemented
OK0777 # 04 Y:2009 04 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,136 $3,129 Implemented
OK0777 # 05 Y:2009 05 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $28,753 $33,300 Implemented
OK0777 # 06 Y:2009 06 2009 INSTALL TIMERS AND/OR THERMOSTATS $2,638 $779 Implemented
OK0776 # 01 Y:2009 01 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $538 $739 Not Implemented
OK0776 # 02 Y:2009 02 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $882 $0 Not Implemented
OK0776 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,054 $0 Not Implemented
OK0776 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,270 $4,952 Not Implemented
OK0776 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,941 $92,541 Not Implemented
OK0776 # 06 Y:2009 06 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $2,373 $1,235 Not Implemented
OK0776 # 07 Y:2009 07 2009 OPERATE BOILERS ON HIGH FIRE SETTING $6,763 $20,340 Not Implemented
OK0776 # 08 Y:2009 08 2009 INSTALL TIMERS AND/OR THERMOSTATS $9,252 $2,759 Not Implemented
OK0776 # 09 Y:2009 09 2009 OPTIMIZE PLANT POWER FACTOR $3,061 $2,908 Not Implemented
OK0776 # 10 Y:2009 10 2009 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $57,485 $63,000 Not Implemented
OK0775 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,182 $0 Implemented
OK0775 # 02 Y:2009 02 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,161 $2,326 Not Implemented
OK0775 # 03 Y:2009 03 2009 RECOVER WASTE HEAT FROM EQUIPMENT $6,617 $5,534 Not Implemented
OK0775 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,208 $11,677 Implemented
OK0775 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,179 $9,264 Not Implemented
OK0775 # 06 Y:2009 06 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,586 $4,119 Not Implemented
OK0775 # 07 Y:2009 07 2009 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $5,419 $386 Not Implemented
OK0775 # 08 Y:2009 08 2009 USE POWER DURING OFF-PEAK PERIODS $30,940 $0 Not Implemented
OK0775 # 09 Y:2009 09 2009 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $19,665 $140,000 Not Implemented
OK0775 # 10 Y:2009 10 2009 INSTALL TIMERS AND/OR THERMOSTATS $3,858 $2,925 Implemented
OK0774 # 01 Y:2009 01 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $607 $1,902 Not Implemented