IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,417

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0406 # 07 Y:1990 07 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,678 $21,372 Not Implemented
GT0407 # 01 Y:1990 01 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,233 $464 Implemented
GT0407 # 02 Y:1990 02 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $198 $422 Not Implemented
GT0407 # 03 Y:1990 03 1990 BURN A LESS EXPENSIVE GRADE OF FUEL $6,760 $0 Implemented
GT0407 # 04 Y:1990 04 1990 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $300 $3,000 Implemented
GT0407 # 05 Y:1990 05 1990 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $940 $0 Implemented
GT0407 # 06 Y:1990 06 1990 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $290 $1,200 Not Implemented
KU0313 # 01 Y:1990 01 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $16,847 $4,000 Not Implemented
KU0313 # 02 Y:1990 02 1990 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,447 $20,000 Implemented
KU0313 # 03 Y:1990 03 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,866 $80 Implemented
KU0313 # 04 Y:1990 04 1990 INSTALL TIMERS AND/OR THERMOSTATS $620 $100 Implemented
KU0313 # 05 Y:1990 05 1990 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $104 $0 Not Implemented
CO0184 # 01 Y:1990 01 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $7,600 $500 Implemented
CO0184 # 02 Y:1990 02 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $6,500 $4,000 Implemented
CO0184 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,630 $12,700 Not Implemented
CO0184 # 04 Y:1990 04 1990 AIR CONDITION ONLY SPACE NECESSARY $8,590 $1,300 Implemented
CO0184 # 05 Y:1990 05 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,320 $3,670 Not Implemented
CO0184 # 06 Y:1990 06 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,280 $2,100 Implemented
CO0184 # 07 Y:1990 07 1990 OPTIMIZE PLANT POWER FACTOR $18,190 $20,700 Not Implemented
CO0185 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,780 $750 Implemented
CO0185 # 02 Y:1990 02 1990 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,370 $13,700 Not Implemented
CO0185 # 03 Y:1990 03 1990 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,390 $200 Implemented
CO0185 # 04 Y:1990 04 1990 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,620 $50 Implemented
CO0185 # 05 Y:1990 05 1990 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,010 $300 Implemented
CO0185 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $790 $940 Not Implemented