IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,302

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0015 # 01 Y:2008 01 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,000 $400 Not Implemented
DL0015 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,400 $3,500 Implemented
DL0015 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,500 $20,000 Implemented
DL0015 # 04 Y:2008 04 2008 ADD AREA LIGHTING SWITCHES $370 $1,500 Implemented
DL0015 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,911 $2,500 Implemented
DL0015 # 06 Y:2008 06 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $14,000 $16,000 Not Implemented
DL0015 # 07 Y:2008 07 2008 REPLACE BOILER $13,000 $20,000 Not Implemented
DL0015 # 08 Y:2008 08 2008 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $15,400 $27,000 Not Implemented
DL0015 # 09 Y:2008 09 2008 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $2,970 $10,000 Not Implemented
DL0015 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,249 $18,000 Implemented
IC0142 # 01 Y:2008 01 2008 INSTALL SPECTRAL REFLECTORS / DELAMP $1,099 $488 Implemented
IC0142 # 02 Y:2008 02 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,855 $9,432 Implemented
IC0142 # 03 Y:2008 03 2008 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $697 $90 Not Implemented
IC0142 # 04 Y:2008 04 2008 USE RADIANT HEATER FOR SPOT HEATING $216 $620 Not Implemented
IC0142 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,469 $1,150 Implemented
IC0142 # 06 Y:2008 06 2008 ELIMINATE COMBUSTIBLE GAS IN FLUE GAS $2,442 $0 Implemented
IC0142 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $525 $507 Implemented
IC0142 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $203 Implemented
IC0142 # 09 Y:2008 09 2008 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $482 $0 Not Implemented
IC0142 # 10 Y:2008 10 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,501 $0 Implemented
SU0270 # 01 Y:2008 01 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,101 $0 Not Implemented
SU0270 # 02 Y:2008 02 2008 USE SYNTHETIC LUBRICANT $952 $0 Not Implemented
SU0270 # 03 Y:2008 03 2008 REPAIR AND ELIMINATE STEAM LEAKS $48,133 $1,453 Implemented
SU0270 # 04 Y:2008 04 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $5,122 $129 Implemented
SU0270 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,799 $1,379 Implemented