IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,295

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0608 # 02 Y:2021 02 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,495 $38,306 Not Implemented
WV0608 # 03 Y:2021 03 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,836 $1,100 Implemented
WV0608 # 04 Y:2021 04 2021 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $952 $0 Implemented
WV0608 # 05 Y:2021 05 2021 DEVELOP A REPAIR/REPLACE POLICY $746 $300 Implemented
LE0509 # 01 Y:2021 01 2021 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,607 $50 Not Implemented
LE0509 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,834 $2,500 Implemented
LE0509 # 03 Y:2021 03 2021 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,755 $56,400 Implemented
LE0509 # 04 Y:2021 04 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,037 $8,000 Implemented
LE0509 # 05 Y:2021 05 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $9,000 Implemented
LE0508 # 01 Y:2021 01 2021 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,328 $100 Implemented
LE0508 # 02 Y:2021 02 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,709 $29,000 Not Implemented
LE0508 # 03 Y:2021 03 2021 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,110 $10,000 Implemented
LE0508 # 04 Y:2021 04 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,625 $3,000 Implemented
LE0508 # 05 Y:2021 05 2021 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,407 $24,000 Implemented
NL0055 # 01 Y:2021 01 2021 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $60,616 $121,800 Implemented
NL0055 # 02 Y:2021 02 2021 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,975 $4,500 Implemented
NL0055 # 03 Y:2021 03 2021 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $6,244 $19,200 Not Implemented
NL0055 # 04 Y:2021 04 2021 USE PRECIPITATING AGENTS IN WASTE WATER TREATMENT THAT PRODUCE THE LEAST QUANTITY OF WASTE $3,858 $146 Implemented
NL0055 # 05 Y:2021 05 2021 IMPROVE HANDLING PRACTICES $3,600 $1,600 Implemented
NL0055 # 06 Y:2021 06 2021 TURN OFF EQUIPMENT WHEN NOT IN USE $1,895 $64 Not Implemented
NL0055 # 07 Y:2021 07 2021 UTILIZE A LESS EXPENSIVE COOLING METHOD $2,036 $1,070 Not Implemented
NL0055 # 08 Y:2021 08 2021 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $252 $1,000 Implemented
SF0569 # 01 Y:2021 01 2021 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,931 $0 Implemented
SF0569 # 02 Y:2021 02 2021 INSTALL TIMERS AND/OR THERMOSTATS $4,698 $3,740 Implemented
SF0569 # 03 Y:2021 03 2021 SHUT OFF COOLING IF COLD OUTSIDE AIR WILL COOL PROCESS $5,693 $9,138 Implemented