IAC logo
Search IAC Recommendations
Sponsored by:
EERE AMO
IAC logo
Search IAC Recommendations

150,601

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0046 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $831 $1,852 Implemented
KU0046 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $266 $393 Implemented
KU0046 # 04 Y:1982 04 1982 PLANT TREES OR SHRUBS NEAR WINDOWS TO SHIELD FROM SUNLIGHT $260 $480 Implemented
KU0046 # 05 Y:1982 05 1982 INSTALL STORM WINDOWS AND DOORS $51 $286 Implemented
KU0047 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,357 $700 Not Implemented
KU0047 # 02 Y:1982 02 1982 REDESIGN PROCESS $18,787 $112,000 Not Implemented
KU0047 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,266 $2,500 Not Implemented
KU0047 # 04 Y:1982 04 1982 INSTALL TIMERS AND/OR THERMOSTATS $27,712 $215 Not Implemented
KU0047 # 05 Y:1982 05 1982 INSTALL AUTOMATIC STACK DAMPER $6,768 $3,500 Implemented
KU0047 # 06 Y:1982 06 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,948 $370 Not Implemented
KU0047 # 07 Y:1982 07 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,115 $1,000 Not Implemented
KU0048 # 01 Y:1982 01 1982 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $29,754 $15,000 Implemented
KU0048 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,256 $5,941 Implemented
KU0048 # 03 Y:1982 03 1982 INSULATE BARE EQUIPMENT $8,484 $21,600 Not Implemented
KU0048 # 04 Y:1982 04 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $13,580 $1,400 Implemented
KU0048 # 05 Y:1982 05 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,088 $13,000 Implemented
KU0048 # 06 Y:1982 06 1982 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $9,296 $1,500 Not Implemented
KU0049 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,612 $3,222 Not Implemented
KU0049 # 02 Y:1982 02 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $42,700 $0 Not Implemented
KU0049 # 03 Y:1982 03 1982 USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY $6,750 $6,900 Not Implemented
KU0049 # 04 Y:1982 04 1982 INSTALL AUTOMATIC STACK DAMPER $399 $65 Not Implemented
KU0049 # 05 Y:1982 05 1982 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $70 $60 Not Implemented
KU0050 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,836 $4,009 Implemented
KU0050 # 02 Y:1982 02 1982 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $118,344 $10,000 Implemented
KU0050 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,013 $1,000 Implemented