Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
163,048
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0025 # 01 Y:1988 | 01 | 1988 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $8,582 | $15,000 | Not Implemented |
AM0025 # 02 Y:1988 | 02 | 1988 | INSULATE BARE EQUIPMENT | $913 | $1,116 | Implemented |
AM0025 # 03 Y:1988 | 03 | 1988 | INSTALL SET-BACK TIMERS | $797 | $0 | Implemented |
AM0025 # 04 Y:1988 | 04 | 1988 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $422 | $0 | Implemented |
AM0025 # 05 Y:1988 | 05 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $72 | $72 | Implemented |
AM0025 # 06 Y:1988 | 06 | 1988 | INSTALL SET-BACK TIMERS | $159 | $0 | Implemented |
AM0026 # 01 Y:1988 | 01 | 1988 | TURN OFF EQUIPMENT WHEN NOT IN USE | $867 | $2,000 | Implemented |
AM0026 # 02 Y:1988 | 02 | 1988 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $8,053 | $1,075 | Implemented |
AM0026 # 03 Y:1988 | 03 | 1988 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,962 | $10,000 | Not Implemented |
AM0026 # 04 Y:1988 | 04 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $851 | $300 | Implemented |
AM0026 # 05 Y:1988 | 05 | 1988 | TURN OFF EQUIPMENT WHEN NOT IN USE | $492 | $123 | Not Implemented |
AM0026 # 06 Y:1988 | 06 | 1988 | INSULATE BARE EQUIPMENT | $182 | $114 | Not Implemented |
UD0255 # 01 Y:1988 | 01 | 1988 | USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS | $7,000 | $8,000 | Not Implemented |
UD0255 # 02 Y:1988 | 02 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $1,509 | $13 | Not Implemented |
UD0255 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,435 | $2,000 | Not Implemented |
UD0255 # 04 Y:1988 | 04 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $350 | $0 | Implemented |
TN0335 # 01 Y:1988 | 01 | 1988 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $40,900 | $36,580 | Implemented |
TN0335 # 02 Y:1988 | 02 | 1988 | INSULATE BARE EQUIPMENT | $30,312 | $4,473 | Not Implemented |
TN0335 # 03 Y:1988 | 03 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $26,084 | $0 | Implemented |
TN0335 # 04 Y:1988 | 04 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,484 | $0 | Implemented |
TN0335 # 05 Y:1988 | 05 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,710 | $210 | Implemented |
TN0335 # 06 Y:1988 | 06 | 1988 | INSTALL SET-BACK TIMERS | $2,137 | $0 | Implemented |
TN0335 # 07 Y:1988 | 07 | 1988 | OPTIMIZE PLANT POWER FACTOR | $13,142 | $9,400 | Implemented |
TN0338 # 01 Y:1988 | 01 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,835 | $42,500 | Not Implemented |
TN0338 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $5,878 | $2,140 | Not Implemented |