IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,573

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0050 # 07 Y:2015 07 2015 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,348 $5,370 Implemented
IP0050 # 08 Y:2015 08 2015 OPTIMIZE PLANT POWER FACTOR $10,314 $19,140 Not Implemented
IP0050 # 09 Y:2015 09 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,085 $21,918 Not Implemented
IP0049 # 01 Y:2015 01 2015 PAY BILLS ON TIME TO AVOID LATE FEES $4,118 $0 Implemented
IP0049 # 02 Y:2015 02 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,197 $8 Implemented
IP0049 # 03 Y:2015 03 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $6,918 $400 Not Implemented
IP0049 # 04 Y:2015 04 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,009 $70 Implemented
IP0049 # 05 Y:2015 05 2015 INSTALL OCCUPANCY SENSORS $1,359 $770 Not Implemented
IP0049 # 06 Y:2015 06 2015 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $5,511 $4,400 Not Implemented
IP0049 # 07 Y:2015 07 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $223 $283 Not Implemented
IP0049 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $7,789 $10,000 Not Implemented
IP0049 # 09 Y:2015 09 2015 LOWER LIGHT FIXTURES IN HIGH CEILING AREAS $4,057 $6,011 Not Implemented
IP0049 # 10 Y:2015 10 2015 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $5,682 $15,286 Not Implemented
IP0049 # 11 Y:2015 11 2015 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $3,976 $21,474 Implemented
IP0048 # 01 Y:2015 01 2015 COMBINE UTILITY METERS $27,805 $21 Not Implemented
IP0048 # 02 Y:2015 02 2015 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,379 $5 Implemented
IP0048 # 03 Y:2015 03 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,718 $5 Implemented
IP0048 # 04 Y:2015 04 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $902 $45 Implemented
IP0048 # 05 Y:2015 05 2015 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,880 $430 Implemented
IP0048 # 06 Y:2015 06 2015 AIR CONDITION ONLY SPACE NECESSARY $394 $193 Not Implemented
IP0048 # 07 Y:2015 07 2015 APPLY FOR INVESTMENT INCENTIVES $8,854 $4,500 Not Implemented
IP0048 # 08 Y:2015 08 2015 APPLY FOR INVESTMENT INCENTIVES $15,491 $9,000 Not Implemented
IP0048 # 09 Y:2015 09 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,176 $8,753 Implemented
IP0048 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $116 $413 Implemented
IP0047 # 01 Y:2015 01 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,458 $163 Implemented